共 22 条
[1]
Wight, MRPII - Unlocking America's Productivity Potential, (1983)
[2]
Kochar, Development of Computer Based Production Systems, (1979)
[3]
Blackstone, A state-of-art survey of dispatching rules for manufacturing jobshop operations, Int. J. Prod. Res., 20, 1, pp. 27-45, (1982)
[4]
Mamcheck, McClelland, Strategic issues in make-to-order manufacturing, Prod. Inv. Manage., pp. 82-95, (1986)
[5]
Burgoine, Beyond mrp II, Production Engineer, pp. 31-33, (1988)
[6]
Goldratt, Computerised shopfloor scheduling, Int. J. Prod. Res., 26, 3, pp. 443-455, (1988)
[7]
Riagatz, Mabert, A framework for the study of due date management in job shops, International Journal of Production Research, 22, 4, pp. 685-695, (1984)
[8]
Das, Dowsland, A model to examine the effect of loading conditions on scheduling rules in a jobshop environment, Int. J. Prod. Res., 19, 5, pp. 577-587, (1981)
[9]
Durand, Silver, New attention for computer scheduling of multi-product plants working batchwise under constraints, Int. J. Prod. Res., 21, 4, pp. 499-509, (1983)
[10]
Leary, Decision support systems aid in management of operations, Ind. Eng., pp. 26-34, (1985)