Evaluating the project success index of public-private partnership projects in Hong Kong: The case of the Cross Harbour Tunnel

被引:17
作者
Osei-Kyei, Robert [1 ]
Chan, Albert P. C. [1 ]
机构
[1] Hong Kong Polytech Univ, Dept Bldg & Real Estate, Hong Kong, Hong Kong, Peoples R China
来源
CONSTRUCTION INNOVATION-ENGLAND | 2018年 / 18卷 / 03期
关键词
Hong Kong; PPP; Public-private partnerships; Fuzzy synthetic evaluation; Cross-Harbour Tunnel; Project success index;
D O I
10.1108/CI-08-2017-0067
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Purpose Since 1960, many public-private partnership (PPP) projects have been implemented in Hong Kong. Some projects have been considered as very successful, whereas others are seen as less successful. Unfortunately, these success outcomes have remained abstract because they are not in quantifiable terms. This paper aims to develop a model that can quantify the success outcome of PPP projects in Hong Kong. Design/methodology/approach Both quantitative and qualitative research approaches were adopted for the study. First, a questionnaire survey was conducted with PPP practitioners in Hong Kong, and thereafter, the fuzzy synthetic evaluation technique was used to develop a project success index for PPP projects in Hong Kong. The Hong Kong Cross-Harbour Tunnel project was used as a case study to demonstrate the applicability of the pragmatic model. Findings The success index model developed consists of four unrelated success criteria groupings: cost effectiveness, quality of services and technical specification, environmental impact and long-term partnership. Further, the computed success index for the Cross-Harbour Tunnel project is 4.06, which indicates that the tunnel project has been highly successful. Originality/value The outputs of this study will enable PPP practitioners in Hong Kong to reliably evaluate the success levels of their projects. In addition, local practitioners can now compare the success levels of two or more PPP projects on the same basis.
引用
收藏
页码:371 / 391
页数:21
相关论文
共 59 条
  • [1] Model for predicting the performance of project managers at the construction phase of mass house building projects
    Ahadzie, D. K.
    Proverbs, D. G.
    Olomolaiye, P. O.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2008, 134 (08) : 618 - 629
  • [2] Future criteria for success of building projects in Malaysia
    Al-Tmeemy, Samiaah M. Hassen M.
    Abdul-Rahman, Hamzah
    Harun, Zakaria
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2011, 29 (03) : 337 - 348
  • [3] Evaluation and ranking of risk factors in public-private partnership water supply projects in developing countries using fuzzy synthetic evaluation approach
    Ameyaw, Effah Ernest
    Chan, Albert P. C.
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2015, 42 (12) : 5102 - 5116
  • [4] [Anonymous], 1995, PRIVATIZED INFRASTRU
  • [5] Chan A. P., 2014, J INFRASTRUCT SYST, V21, P1
  • [6] Chan A.P.C., 2004, BENCHMARK INT J, V11, P203, DOI [DOI 10.1108/14635770410532624, 10.1108/]
  • [7] Potential Obstacles to Successful Implementation of Public-Private Partnerships in Beijing and the Hong Kong Special Administrative Region
    Chan, Albert P. C.
    Lam, Patrick T. I.
    Chan, Daniel W. M.
    Cheung, Esther
    Ke, Yongjian
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2010, 26 (01) : 30 - 40
  • [8] Drivers for Adopting Public Private Partnerships-Empirical Comparison between China and Hong Kong Special Administrative Region
    Chan, Albert P. C.
    Lam, Patrick T. I.
    Chan, Daniel W. M.
    Cheung, Esther
    Ke, Yongjian
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2009, 135 (11) : 1115 - 1124
  • [9] Framework of success criteria for design/build projects
    Chan, APC
    Scott, D
    Lam, EWM
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2002, 18 (03) : 120 - 128
  • [10] CHEUNG E, 2009, THESIS