The impact of contractors' prequalification on construction project delivery in Nigeria

被引:36
作者
Aje, Isaac [1 ]
机构
[1] Fed Univ Technol Akure, Dept Quant Surveying, Akure, Nigeria
关键词
Prequalification; Due process; Impact; Project delivery; Project management; Construction operations; Contract workers; Nigeria;
D O I
10.1108/09699981211206098
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose - Prequalification of contractors is a very important step in construction project procurement under the contract "Due Process" policy in Nigeria. The purpose of this study, therefore, is to investigate the impact of contractors' prequalification on cost, time and quality performance of construction projects. Design/methodology/approach - Data were collected with the aid of a questionnaire addressed to construction practitioners selected from clients, consultants and contractors' organizations. Also archival data on 77 completed building projects relating to prequalification assessment of contractors and project delivery variables were sourced from consultant quantity surveyors. The data were analysed with the aid of mean score and one-way analysis of variance (ANOVA). Findings - The results show that contractors' prequalification has significant impact on time and quality performance of construction projects as evidenced by p-values of 0.039 and 0.030, respectively. Practical implications - The findings should provide a valuable reference for clients and consultants during contractors' prequalification and contract award. Originality/value - The outcome of this paper will assist clients and consultants in the construction industry to carry out objective assessment of contractors' potential performance in relation to project goals prior to contract award.
引用
收藏
页码:159 / +
页数:15
相关论文
共 43 条
[1]  
Aje I.O., 2007, CIB WORLD BUILD C CA
[2]  
Akintoye A., 2000, CONSTRUCTION MANAGEM, V18, P161, DOI DOI 10.1080/014461900370799
[3]  
[Anonymous], 2000, CONSTR MANAG ECON, DOI DOI 10.1080/014461900407356
[4]  
Budget Monitoring and Price Intelligent Unit, 2005, ABC CONTR DUE PROC P
[5]   Critical success factors for different project objectives [J].
Chua, DKH ;
Kog, YC ;
Loh, PK .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1999, 125 (03) :142-150
[6]   Comparing contributors to time and cost performance in building projects [J].
Dissanayaka, SM ;
Kumaraswamy, MM .
BUILDING AND ENVIRONMENT, 1999, 34 (01) :31-42
[7]  
El-Sawalhi N., 2007, International Journal of Project Management, V25, P465, DOI 10.1016/j.ijproman.2006.11.011
[8]  
FELLOWS R, 1997, RES METHODS CONSTRUC
[9]  
Flanagan R., 1990, P INT COUNC CONSTR R, P230
[10]  
Hatush Z., 1997, CONSTR MANAG ECON, V15, P19, DOI [10.1080/014461997373088, DOI 10.1080/014461997373088]