共 50 条
- [21] Lattice commissioning strategy for the B-Factory PROCEEDINGS OF THE 1997 PARTICLE ACCELERATOR CONFERENCE, VOLS 1-3: PLENARY AND SPECIAL SESSIONS ACCELERATORS AND STORAGE RINGS - BEAM DYNAMICS, INSTRUMENTATION, AND CONTROLS, 1998, : 2586 - 2588
- [24] A CENTRAL TRACKING DETECTOR FOR A B-FACTORY NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 1989, 277 (01): : 110 - 115
- [26] Impedance budget for the KEK B-factory PROCEEDINGS OF THE 1995 PARTICLE ACCELERATOR CONFERENCE, VOLS 1-5, 1996, : 3082 - 3084
- [27] Survey and alignment of SLAC's B-factory PROCEEDINGS OF THE 1997 PARTICLE ACCELERATOR CONFERENCE, VOLS 1-3: PLENARY AND SPECIAL SESSIONS ACCELERATORS AND STORAGE RINGS - BEAM DYNAMICS, INSTRUMENTATION, AND CONTROLS, 1998, : 3666 - 3668
- [28] Special issue: the KEK asymmetric B-factory NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2003, 499 (01): : VII - VII
- [29] Optimization of dynamic aperture for the KEKB B-Factory COMPUTATIONAL ACCELERATOR PHYSICS, 1997, (391): : 215 - 220