PARALLEL-MACHINE SCHEDULING WITH FRACTIONAL OPERATOR REQUIREMENTS

被引:7
作者
BOURLAND, KE
CARL, LK
机构
[1] SOLSTICE OPTIMIZAT,PORTLAND,OR
[2] UNIV TENNESSEE,KNOXVILLE,TN 37996
关键词
D O I
10.1080/07408179408966628
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper discusses the fractional operator problem, which involves the production of many parts on several parallel machines. In this problem, operators can monitor more than one adjacent machine subject to the operator requirements of the parts being produced on those machines. Thus, the combination of parts being produced determines the number of operators required. We consider minimizing the average setup and holding costs subject to a constraint on the number of operators available. We describe planning- and control-level versions of the problem and give formulations that provide a basis for future work.
引用
收藏
页码:56 / 65
页数:10
相关论文
共 8 条
[1]  
Brualdi R. A., 2010, INTRO COMBINATORICS
[2]  
CARRENO JJ, 1990, MANAGE SCI, V3, P348
[3]   A STATE-OF-THE-ART REVIEW OF PARALLEL-MACHINE SCHEDULING RESEARCH [J].
CHENG, TCE ;
SIN, CCS .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1990, 47 (03) :271-292
[4]   THE ECONOMIC LOT-SCHEDULING PROBLEM - ACHIEVING FEASIBILITY USING TIME-VARYING LOT SIZES [J].
DOBSON, G .
OPERATIONS RESEARCH, 1987, 35 (05) :764-771
[5]   ITERATIVE PROCEDURE FOR SINGLE-MACHINE MULTI-PRODUCT LOT SCHEDULING PROBLEM [J].
DOLL, CL ;
WHYBARK, DC .
MANAGEMENT SCIENCE SERIES A-THEORY, 1973, 20 (01) :50-55
[6]   SCHEDULING THE PRODUCTION OF SEVERAL ITEMS WITH RANDOM DEMANDS IN A SINGLE FACILITY [J].
GALLEGO, G .
MANAGEMENT SCIENCE, 1990, 36 (12) :1579-1592
[7]   A NOTE ON LINEAR-PROGRAMMING AND THE SINGLE-MACHINE LOT SIZE SCHEDULING PROBLEM [J].
HODGSON, TJ ;
NUTTLE, HLW .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1986, 24 (04) :939-943
[8]  
SLOWINSKI R, 1987, ENG COSTS PRODUCTION, V14, P11