Asbestos Hazards Analysis in Construction Projects With the Fault Tree Analysis and the Failure Mode and Effect Analysis

被引:0
|
作者
Marchello, Sara
机构
关键词
HEALTH AND SAFETY AT WORK; RISK ANALYSIS; ASBESTOS RISK; FAULT TREE ANALYSIS; FAILURE MODE AND EFFECT ANALYSIS;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The Italian construction sector suffered more than the other industrial sector the negative effects of the world economic crisis. A consequence has been a change in its organization concerning labour and managent on the health and safety issues. Evidence of this can be found in an increase of fatal accidents and occupational diseases. In particular occupational diseases became a health concern in construction. The aim of the presented research work is to assess the hazard of asbestos fibres inhalation due to decommissing of old industrial promises with roofing of asbestos. The developed approach starts from a probabilistic assessment of the risk, using the Risk Analysis tools, the Fault Tree Analysis (FTA) and the Failure Mode and Effect Analysis (FMEA). Risk assessment through the FTA is based on a backward approach: it starts from the malfunction of the system, called Top Event, in order to look for the triggering causes (events); on the contrary, the FMEA analysis is based on a forward approach: they start from a set of events and go on in order to analyse what kind of malfunctioning these can generate in the system. Both the FTA and the FMEA are applied to three approved decontamination techniques (encapsulation, confinement and removal), and for each of them operational phases, equipment, building products and PPE (Personal Protective Equipment) are evaluated highlighting the procedures needed to operate in complete safety. With this approach the main factors that contribute to the increase of the risk of asbestos fibres inhalation are detected: preliminary analysis and assessment of the state of building decay, the use and maintence of PPE and machinery, and the supervision during main working phases.
引用
收藏
页码:116 / 127
页数:12
相关论文
共 50 条
  • [21] Quality Improvement for A Shoe Laundry Using Integration Model of Service Blueprint, Failure Mode and Effect Analysis, and Fault Tree Analysis
    Hartono, Natalia
    Panjaitan, Andry M.
    Noel, Abram
    1ST INTERNATIONAL CONFERENCE ON INDUSTRIAL, ELECTRICAL AND ELECTRONICS (ICIEE 2018), 2018, 218
  • [22] Failure probability analysis by employing fuzzy fault tree analysis
    Yazdi M.
    Nikfar F.
    Nasrabadi M.
    International Journal of System Assurance Engineering and Management, 2017, 8 (Suppl 2) : 1177 - 1193
  • [23] Improvement of Failure Mode, Effects, and Criticality Analysis by Using Fault Tree Analysis and Analytical Hierarchy Process
    Mzougui, Ilyas
    Elfelsoufi, Zoubir
    JOURNAL OF FAILURE ANALYSIS AND PREVENTION, 2019, 19 (04) : 942 - 949
  • [24] Improvement of Failure Mode, Effects, and Criticality Analysis by Using Fault Tree Analysis and Analytical Hierarchy Process
    Ilyas Mzougui
    Zoubir Elfelsoufi
    Journal of Failure Analysis and Prevention, 2019, 19 : 942 - 949
  • [25] The Failure Mode and Effect Analysis of Tender for Construction Companies in Indonesia
    Sugiyanto
    Darmawan
    QUALITY-ACCESS TO SUCCESS, 2023, 24 (192): : 44 - 52
  • [26] Incorporating fault tree analysis into event tree analysis for failure of city gas pipelines
    Huang, Xiao-Mei
    Peng, Shi-Ni
    Li, Bai-Zhan
    Yang, Mao-Hua
    Chongqing Jianzhu Daxue Xuebao/Journal of Chongqing Jianzhu University, 2006, 28 (06): : 99 - 101
  • [27] Risk assessment of construction projects for water conveyance tunnels using fuzzy fault tree analysis
    Ardeshir, A.
    Amiri, M.
    Ghasemi, Y.
    Errington, M.
    INTERNATIONAL JOURNAL OF CIVIL ENGINEERING, 2014, 12 (4A) : 396 - 412
  • [28] Risk assessment of construction projects for water conveyance tunnels using fuzzy fault tree analysis
    Ardeshir, A., 1600, Iran University of Science and Technology (12):
  • [29] A hybrid risk prioritization approach in construction projects using failure mode and effective analysis
    Karamoozian, Amirhossein
    Wu, Desheng
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2020, 27 (09) : 2661 - 2686
  • [30] A New Application of an Evolving Tree to Failure Mode and Effect Analysis Methodology
    Chang, Wui Lee
    Tay, Kai Meng
    Lim, Chee Peng
    NEURAL INFORMATION PROCESSING, ICONIP 2014, PT III, 2014, 8836 : 415 - 422