共 50 条
- [31] THE CHEST TUBE - A PROCEDURE FOR PROPER PLACEMENT [J]. POSTGRADUATE MEDICINE, 1980, 68 (01) : 156 - 158
- [32] PROCEDURE FOR DESIGN ANALYSIS OF A TUBE FURNACE [J]. CHEMICAL AND PETROLEUM ENGINEERING, 2006, 42 (5-6) : 241 - 243
- [33] INCREASING TUBE ACCURACY ON THE 140 TUBE-PRODUCTION UNIT [J]. METALLURGIST, 1983, 27 (9-10) : 315 - 318
- [34] MASTERING TUBE PRODUCTION ON THE 140 TUBE-ROLLING UNIT [J]. METALLURGIST, 1978, 22 (9-10) : 611 - 613
- [35] IMPROVING TUBE QUALITY ON THE 140 TUBE-PRODUCTION UNIT [J]. METALLURGIST, 1980, 24 (3-4) : 106 - 109
- [36] A new centrifuge tube ( A tube at a flat and mobile level) [J]. COMPTES RENDUS DES SEANCES DE LA SOCIETE DE BIOLOGIE ET DE SES FILIALES, 1913, 74 : 347 - 349
- [37] DELTA MILL FOR WELDED TUBES - NEW DEVELOPMENT AT TUBE PRODUCTS LIMITED [J]. METALLURGIA, 1969, 80 (480): : 141 - &
- [39] New products in Chief Engineers: Eliminate boiler tube torch cutting [J]. Chief Engineer, 1996, 61 (11):
- [40] TUBE PRODUCTION CAPACITY INCREASED - NEW TYPE DRAWBENCH BY BROOKES [J]. METALLURGIA, 1967, 76 (453): : 23 - &