Estimating facilities maintenance cost using post-occupancy evaluation and fuzzy set theory

被引:6
|
作者
Alshibani, Adel [1 ]
Hassanain, Mohammad A. [1 ]
机构
[1] King Fahd Univ Petr & Minerals, Architectural Engn Dept, Dhahran, Saudi Arabia
关键词
Cost; Risk; Maintenance; Fuzzy set theory; Judgement; Post-occupancy evaluation;
D O I
10.1108/JQME-05-2017-0038
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose The purpose of this paper is to introduce a new general approach for estimating the maintenance cost of constructed facilities. The proposed approach consists of four components, including: facility work breakdown structure; historical maintenance cost and cost contingency data of actual completed projects; feedback obtained from the post-occupancy evaluation (POE); and fuzzy set theory (FST) to define the uncertainty associated with the maintenance cost and cost contingency as an alternative approach to simulation. Design/methodology/approach Literature review of the existing methods used for estimating maintenance cost of constructed facilities was conducted to highlight the limitations of the existing methods and models. The paper then introduced a new approach in which the results obtained from POE are integrated with the estimator's judgment in estimating maintenance cost of constructed facility. As a proof of concept, the developed approach is tested on a private school facility in the city of Khobar, Saudi Arabia. The application of the proposed approach in this case project demonstrates its applicability and features in comparison with the existing practice. Findings The application of the developed approach on a school case project demonstrated that the developed approach can provide a reliable facility maintenance cost estimate, narrow the uncertainties and vagueness associated with the estimated cost, and provide the estimator with the necessary information to conduct risk analysis with less effort, less computations and less complexity comparing with that provided by complex simulation. The results also showed that integrating POE in the estimating process can provide more accurate cost estimate with high level of confidence. Originality/value The paper presents a new approach for estimating facility maintenance cost. The developed approach introduced a new concept that assists maintenance contractors in preparing facility maintenance estimate with improved accuracy while satisfying the facility user's needs. The proposed approach integrates the estimator's judgment with POE to model the uncertainties associated with cost using FST as an alternative approach for complex simulation.
引用
收藏
页码:449 / 467
页数:19
相关论文
共 50 条
  • [41] Quality assessment of on-campus student housing facilities through a holistic post-occupancy evaluation (A case study of Iran)
    Nemati, Mohammad Ali
    Rastaghi, Zahra
    ARCHITECTURAL ENGINEERING AND DESIGN MANAGEMENT, 2024, 20 (04) : 719 - 740
  • [42] Enhanced retrofitting process by integrating post-occupancy evaluation and user perception
    Wegertseder Martinez, Paulina
    Trebilcock Kelly, Maureen
    REVISTA DE LA CONSTRUCCION, 2018, 17 (03): : 499 - 516
  • [43] Post-occupancy Evaluation and Thermal Comfort: State of the Art and New Approaches
    Gossauer, Elke
    Wagner, Andreas
    ADVANCES IN BUILDING ENERGY RESEARCH, 2007, 1 (01) : 151 - 175
  • [44] Learning Spaces for a Competency-based Model: Post-occupancy Evaluation
    Rincon-Flores, Elvira G.
    Mendoza Moreno, Jesus Alexei
    Lopez-Camacho, Eunice
    Mena, Juanjo
    PROCEEDINGS OF THE 2021 IEEE GLOBAL ENGINEERING EDUCATION CONFERENCE (EDUCON), 2021, : 366 - 371
  • [45] Post-occupancy evaluation of the actual performance of a low-carbon building
    Qiao, Jun
    Zhang, Xian
    Hao, Cuicai
    Liu, Shaoliang
    Zhang, Yulong
    Xing, Kaijie
    Yang, Peiyuan
    ENERGY REPORTS, 2023, 10 : 228 - 243
  • [46] Post-Occupancy Evaluation of State Schools in 5 Climatic Zones of Chile
    Armijo, Gabriela
    Whitman, Christopher J.
    Casals, Roberto
    GAZI UNIVERSITY JOURNAL OF SCIENCE, 2011, 24 (02): : 365 - 374
  • [47] ASSESSING BUILDING PERFORMANCE: ITS EVOLUTION FROM POST-OCCUPANCY EVALUATION
    Preiser, Wolfgang F. E.
    Nasar, Jack L.
    ARCHNET-IJAR INTERNATIONAL JOURNAL OF ARCHITECTURAL RESEARCH, 2008, 2 (01) : 84 - 99
  • [48] Principal contractor involvement in post-occupancy evaluation in the UK construction industry
    Williams, Tristan
    Bouchlaghem, Dino
    Loveday, Dennis
    Law, Charlie
    FACILITIES, 2013, 31 (1-2) : 39 - 55
  • [49] On China's Garden Design Based on Thought of "Post-occupancy Evaluation"
    Li, Ping
    2013 2ND INTERNATIONAL CONFERENCE ON SOCIAL SCIENCE AND EDUCATION (ICSSE 2013), PT 2, 2013, 47 : 610 - 614
  • [50] Post-occupancy evaluation in indoor comfort conditions for green office buildings
    Aycam, Idil
    Gorgulu, Leyla Senem
    Soyluk, Asena
    GRADEVINAR, 2022, 74 (09): : 721 - 737