Estimating facilities maintenance cost using post-occupancy evaluation and fuzzy set theory

被引:6
|
作者
Alshibani, Adel [1 ]
Hassanain, Mohammad A. [1 ]
机构
[1] King Fahd Univ Petr & Minerals, Architectural Engn Dept, Dhahran, Saudi Arabia
关键词
Cost; Risk; Maintenance; Fuzzy set theory; Judgement; Post-occupancy evaluation;
D O I
10.1108/JQME-05-2017-0038
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose The purpose of this paper is to introduce a new general approach for estimating the maintenance cost of constructed facilities. The proposed approach consists of four components, including: facility work breakdown structure; historical maintenance cost and cost contingency data of actual completed projects; feedback obtained from the post-occupancy evaluation (POE); and fuzzy set theory (FST) to define the uncertainty associated with the maintenance cost and cost contingency as an alternative approach to simulation. Design/methodology/approach Literature review of the existing methods used for estimating maintenance cost of constructed facilities was conducted to highlight the limitations of the existing methods and models. The paper then introduced a new approach in which the results obtained from POE are integrated with the estimator's judgment in estimating maintenance cost of constructed facility. As a proof of concept, the developed approach is tested on a private school facility in the city of Khobar, Saudi Arabia. The application of the proposed approach in this case project demonstrates its applicability and features in comparison with the existing practice. Findings The application of the developed approach on a school case project demonstrated that the developed approach can provide a reliable facility maintenance cost estimate, narrow the uncertainties and vagueness associated with the estimated cost, and provide the estimator with the necessary information to conduct risk analysis with less effort, less computations and less complexity comparing with that provided by complex simulation. The results also showed that integrating POE in the estimating process can provide more accurate cost estimate with high level of confidence. Originality/value The paper presents a new approach for estimating facility maintenance cost. The developed approach introduced a new concept that assists maintenance contractors in preparing facility maintenance estimate with improved accuracy while satisfying the facility user's needs. The proposed approach integrates the estimator's judgment with POE to model the uncertainties associated with cost using FST as an alternative approach for complex simulation.
引用
收藏
页码:449 / 467
页数:19
相关论文
共 50 条
  • [1] Post-occupancy evaluation of research and academic laboratory facilities
    Hassanain, Mohammad A.
    Sanni-Anibire, Muizz O.
    Mahmoud, Abubakar Sadiq
    Ahmed, Wahhaj
    INTERNATIONAL JOURNAL OF BUILDING PATHOLOGY AND ADAPTATION, 2020, 38 (05) : 797 - 810
  • [2] Framework model for post-occupancy evaluation of school facilities
    Hassanain, Mohammad A.
    Iftikhar, Ali
    Structural Survey, 2015, 33 (4-5) : 322 - 336
  • [3] Post-Occupancy Evaluation of Housing Facilities: Overview and Summary of Methods
    Sanni-Anibire, Muizz O.
    Hassanain, Mohammad A.
    Al-Hammad, Abdul-Mohsen
    JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2016, 30 (05)
  • [4] How do post-occupancy evaluation and the facilities manager meet?
    Eley, J
    BUILDING RESEARCH AND INFORMATION, 2001, 29 (02) : 164 - 167
  • [5] Quality assessment of student housing facilities through post-occupancy evaluation
    Sanni-Anibire, Muizz O.
    Hassanain, Mohammad A.
    ARCHITECTURAL ENGINEERING AND DESIGN MANAGEMENT, 2016, 12 (05) : 367 - 380
  • [6] Post-Occupancy Indoor Environmental Quality Evaluation of Student Housing Facilities
    Hassanain, Mohammad A.
    ARCHITECTURAL ENGINEERING AND DESIGN MANAGEMENT, 2007, 3 (04) : 249 - 256
  • [7] Research Progress of Post-Occupancy Evaluation
    Wang, Zhaohong
    Zhan, Wei
    Fu, Qiang
    2011 3RD WORLD CONGRESS IN APPLIED COMPUTING, COMPUTER SCIENCE, AND COMPUTER ENGINEERING (ACC 2011), VOL 1, 2011, 1 : 467 - +
  • [8] A critique of post-occupancy evaluation in the UK
    Durosaiye, Isaiah Oluremi
    Hadjri, Karim
    Liyanage, Champika Lasanthi
    JOURNAL OF HOUSING AND THE BUILT ENVIRONMENT, 2019, 34 (01) : 345 - 352
  • [9] A critique of post-occupancy evaluation in the UK
    Isaiah Oluremi Durosaiye
    Karim Hadjri
    Champika Lasanthi Liyanage
    Journal of Housing and the Built Environment, 2019, 34 : 345 - 352
  • [10] Post-occupancy evaluation - where are you?
    Cooper, I
    BUILDING RESEARCH AND INFORMATION, 2001, 29 (02) : 158 - 163