Squeezing deformation in layered surrounding rock and force characteristics of support system of a tunnel under high in-situ stress

被引:0
|
作者
Sha Peng [1 ,2 ]
Wu Fa-quan [1 ]
Li Xiang [3 ]
Liang Ning [1 ,2 ]
Chang Jin-yuan [4 ]
机构
[1] Chinese Acad Sci, Inst Geol & Geophys, Key Lab Shale Gas & Geoengn, Beijing 100029, Peoples R China
[2] Univ Chinese Acad Sci, Beijing 100049, Peoples R China
[3] China Railway First Survey & Design Inst Grp Co L, Xian 710043, Shaanxi, Peoples R China
[4] Shaoxing Univ, Coll Civil Engn, Shaoxing 312000, Zhejiang, Peoples R China
关键词
tunneling engineering; in-situ monitoring; support system; mechanical characteristics; numerical analysis;
D O I
10.16285/j.rsm.2015.05.024
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
The layered soft rock is widely distributed in Western China, such as slate, carbonaceous slate, phyllite, and so forth. During the tunnel excavation, geotechnical problems frequently occur in the surrounding rock, such as excessive overbreak and intense deformation associated with asymmetric squeezing, because of low strength, poor self-stability and intense anisotropy of structural strength in layered surrounding rock. Large deformation can result in intense damage to the primary support, and even splitting of secondary support, significantly influencing the construction and security of tunnels. At the site of Liangshui tunnel in Lanzhou-Chongqing railway, a series of real-time contact pressure monitoring tests is conducted at different positions in section between surrounding rock and support system. Mechanical responses of the support system are analyzed in time and spatial domains using the monitored contact pressure. In-situ monitoring and numerical inversion analyses of displacement are also performed. The results indicate that the contact pressure of support system shows irregular distribution in space, which agrees with the concentrated deformation position of the surrounding rock; and its variation often lasts for a long period of time due to the influence of excavation method. The failure of the steel arch frame takes place in the weak axis plane because of its smaller lateral anti-bending rigidity. Meanwhile, the monitoring data show that their occurrence significantly lags behind the stabilization of convergence deformation. Based on the force characteristics of the support system, a more reasonable design scheme is proposed for tunneling in such a kind of rock.
引用
收藏
页码:1407 / 1414
页数:8
相关论文
共 17 条
  • [1] Anagnostou G., 2007, P 11 ISRM C
  • [2] In-situ stress measurement and surrounding rock stability analysis of The Gaoligong Mountain tunnel
    Bao, Linhai
    [J]. ADVANCES IN CIVIL AND STRUCTURAL ENGINEERING III, PTS 1-4, 2014, 501-504 : 1766 - 1773
  • [3] [房倩 Fang Qian], 2011, [岩石力学与工程学报, Chinese Journal of Rock Mechanics and Engineering], V30, P564
  • [4] Itasca, 2007, 3DEC 3 DIM DIST EL C
  • [5] Jin XG, 2005, ROCK SOIL MECH, V26, P1473
  • [6] KOVARI K., 2009, WORLD TUNN C BUD HUN, P1
  • [7] Lei Mingfeng, 2013, Journal of Central South University (Science and Technology), V44, P3316
  • [8] [李鹏飞 Li Pengfei], 2010, [岩石力学与工程学报, Chinese Journal of Rock Mechanics and Engineering], V29, P1690
  • [9] [刘招伟 Liu Zhaowei], 2010, [土木工程学报, China Civil Engineering Journal], V43, P111
  • [10] A new approach to obtain tunnel support pressure for polyaxial state of stress
    Scussel, D.
    Chandra, S.
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2013, 36 : 80 - 88