SCHEDULING THE CRICKET WORLD CUP - A CASE-STUDY

被引:20
作者
ARMSTRONG, J [1 ]
WILLIS, RJ [1 ]
机构
[1] MONASH UNIV,CLAYTON,VIC 3168,AUSTRALIA
关键词
CRICKET; SCHEDULING; SPORTS;
D O I
10.2307/2583869
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper describes the scheduling of the matches for the 1992 World Cup of Cricket using a heuristic method programmed in Lotus 1-2-3. The many constraints of different types precluded an analytical approach and the authors describe their method and solution.
引用
收藏
页码:1067 / 1072
页数:6
相关论文
共 1 条