SOME OPTIMUM ALGORITHMS FOR SCHEDULING PROBLEMS WITH CHANGEOVER COSTS

被引:12
作者
HU, TC
KUO, YS
RUSKEY, F
机构
[1] UNIV VICTORIA,DEPT COMP SCI,VICTORIA V8W 2Y2,BC,CANADA
[2] NATL CHIAO TANG UNIV,HSINCHU,TAIWAN
关键词
COMPUTER PROGRAMMING - Algorithms - SCHEDULING - Optimization - TECHNOLOGICAL FORECASTING;
D O I
10.1287/opre.35.1.94
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
We consider a production line that can produce one of n items per day. The demand schedule for all items is known in advance, and all items must be produced on or before their deadlines. We want a production schedule that meets all demand deadlines and minimizes the total changeover cost. The changeover cost has a special structure: it is (i) one dollar if the production line changes from producing item i to item j and i is less than j, and (ii) zero if i is greater than or equal to j. We also consider multiple identical production lines with all demands due at the end of every month, and assume that there is exactly enough demand at the end of every month. We obtain optimum production schedules for both the single-line and multiple-line case.
引用
收藏
页码:94 / 99
页数:6
相关论文
共 5 条
[1]  
BRUNO J, SIAM J COMPUT, V7, P393
[2]  
DRISCOLL WC, AIIE T, V9, P388
[3]   MINIMUM CHANGE-OVER SCHEDULING OF SEVERAL PRODUCTS ON 1 MACHINE [J].
GLASSEY, CR .
OPERATIONS RESEARCH, 1968, 16 (02) :342-&
[4]  
Knuth D. E., 1973, ART COMPUTER PROGRAM
[5]  
MITSUMORI S, IEEE T SYST MAN CYBE, V2, P486