2 PARALLEL MACHINE SEQUENCING PROBLEMS INVOLVING CONTROLLABLE JOB PROCESSING TIMES

被引:90
作者
ALIDAEE, B [1 ]
AHMADIAN, A [1 ]
机构
[1] UNIV SO COLORADO,DEPT MANAGEMENT,PUEBLO,CO 81001
关键词
MULTIMACHINE SCHEDULING; CONTROLLABLE TIMES; APPLICATIONS OF TRANSPORTATION PROBLEM;
D O I
10.1016/0377-2217(93)90245-I
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In this note we consider a problem of scheduling n single-operation jobs on m non-identical machines where the sequencing of the jobs and their processing times are decision variables. It is assumed that the cost of performing a job is a linear function of its processing time. The scheduling cost to be minimized is: (A) the total processing cost plus total flow time, (B) the total processing cost plus total weighted earliness and weighted tardiness. We reduce each problem to a transportation problem that can be solved by a polynomial time algorithm.
引用
收藏
页码:335 / 341
页数:7
相关论文
共 13 条
[1]  
ALIDAEE B, 1991, IN PRESS J OPERATION
[2]  
BRUNO J, 1974, COMMUN ACM, P382
[3]  
DANIELS RL, 1986, OPER RES, V37, P981
[4]  
EISELT HA, 1984, COMPUTERS OPERATIONS, V4, P397
[5]   THE FACTORED TRANSPORTATION PROBLEM [J].
EVANS, JR .
MANAGEMENT SCIENCE, 1984, 30 (08) :1021-1024
[6]   FUNCTIONAL EQUATION AND ITS APPLICATION TO RESOURCE ALLOCATION AND SEQUENCING PROBLEMS [J].
LAWLER, EL ;
MOORE, JM .
MANAGEMENT SCIENCE SERIES A-THEORY, 1969, 16 (01) :77-84
[7]   A 2-MACHINE FLOW-SHOP SCHEDULING PROBLEM WITH CONTROLLABLE JOB PROCESSING TIMES [J].
NOWICKI, E ;
ZDRZALKA, S .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1988, 34 (02) :208-220
[8]   A SURVEY OF RESULTS FOR SEQUENCING PROBLEMS WITH CONTROLLABLE PROCESSING TIMES [J].
NOWICKI, E ;
ZDRZALKA, S .
DISCRETE APPLIED MATHEMATICS, 1990, 26 (2-3) :271-287
[9]   SINGLE-MACHINE SEQUENCING WITH CONTROLLABLE PROCESSING TIMES [J].
PANWALKAR, SS ;
RAJAGOPALAN, R .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1992, 59 (02) :298-302
[10]  
Papadimitriou C. H., 1998, COMBINATORIAL OPTIMI