共 50 条
- [2] AVAILABILITY AND COST ANALYSIS OF A PARALLEL REDUNDANT COMPLEX SYSTEM WITH TWO TYPES OF FAILURE UNDER PREEMPTIVE-RESUME REPAIR DISCIPLINE USING GUMBEL-HOUGAARD FAMILY COPULA IN REPAIR INTERNATIONAL JOURNAL OF RELIABILITY QUALITY & SAFETY ENGINEERING, 2008, 15 (04): : 341 - 365
- [3] DEPENDABILITY OF A COMPLEX SYSTEM WITH GENERAL REPAIR DISTRIBUTION UNDER PREEMPTIVE PRIORITY RESUME ZEITSCHRIFT FUR ANGEWANDTE MATHEMATIK UND MECHANIK, 1970, 50 (08): : 499 - &
- [4] AVAILABILITY AND COST ANALYSIS OF A PARALLEL REDUNDANT COMPLEX SYSTEM WITH TWO TYPES OF FAILURE UNDER PREEMPTIVE-RESUME REPAIR DISCIPLINE USING GUMBEL-HOUGAARD FAMILY COPULA IN REPAIR (vol 15, pg 341, 2008) INTERNATIONAL JOURNAL OF RELIABILITY QUALITY & SAFETY ENGINEERING, 2008, 15 (05): : 495 - 495
- [5] AVAILABILITY ANALYSIS OF A PART OF RUBBER TUBE PRODUCTION SYSTEM UNDER PREEMPTIVE RESUME PRIORITY REPAIR INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2009, 16 (04): : 260 - 269
- [7] Availability Analysis of Rubber Preparation System a subsystem of a tube manufacturing plant under Preemptive Resume Priority Repair IEEM: 2008 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-3, 2008, : 506 - +
- [8] COMPLEX SYSTEM RELIABILITY WITH GENERAL REPAIR TIME DISTRIBUTIONS UNDER PREEMPTIVE RESUME REPAIR DISCIPLINE MICROELECTRONICS AND RELIABILITY, 1973, 12 (04): : 351 - 356
- [9] Availability and cost analysis of a standby complex system with different types of failure under waiting repair discipline using Gumbel-Hougaard Family copula distribution PROCEEDINGS OF THE 2014 INTERNATIONAL CONFERENCE ON ISSUES AND CHALLENGES IN INTELLIGENT COMPUTING TECHNIQUES (ICICT), 2014, : 180 - 186
- [10] COST-ANALYSIS, AVAILABILITY AND MTTF OF A 3 STATE STANDBY COMPLEX SYSTEM UNDER COMMON-CAUSE AND HUMAN FAILURES MICROELECTRONICS AND RELIABILITY, 1995, 35 (01): : 91 - 95