Short-term power generation scheduling rules for cascade hydropower stations based on hybrid algorithm

被引:11
作者
Xie, Wei [1 ]
Ji, Chang-ming [1 ]
Yang, Zi-jun [2 ]
Zhang, Xiao-xing [3 ]
机构
[1] North China Elect Power Univ, Beijing Key Lab New & Renewable Energy, Beijing 102206, Peoples R China
[2] Hydrochina Kunming Engn Corp, Kunming 650051, Yunnan, Peoples R China
[3] Jinsha River Hydropower Dev Co Ltd, Kunming 650228, Yunnan, Peoples R China
关键词
scheduling rule; short-time power generation dispatching; hybrid algorithm; cascade hydropower station;
D O I
10.3882/j.issn.1674-2370.2012.01.005
中图分类号
TV21 [水资源调查与水利规划];
学科分类号
081501 ;
摘要
Power generation dispatching is a large complex system problem with multi-dimensional and nonlinear characteristics. A mathematical model was established based on the principle of reservoir operation. A large quantity of optimal scheduling processes were obtained by calculating the daily runoff process within three typical years, and a large number of simulated daily runoff processes were obtained using the progressive optimality algorithm (POA) in combination with the genetic algorithm (GA). After analyzing the optimal scheduling processes, the corresponding scheduling rules were determined, and the practical formulas were obtained. These rules can make full use of the rolling runoff forecast and carry out the rolling scheduling. Compared with the optimized results, the maximum relative difference of the annual power generation obtained by the scheduling rules is no more than 1%. The effectiveness and practical applicability of the scheduling rules are demonstrated by a case study. This study provides a new perspective for formulating the rules of power generation dispatching.
引用
收藏
页码:46 / 58
页数:13
相关论文
共 19 条
[11]   Short-term combined economic emission scheduling of hydrothermal systems with cascaded reservoirs using particle swarm optimization technique [J].
Mandal, K. K. ;
Chakraborty, N. .
APPLIED SOFT COMPUTING, 2011, 11 (01) :1295-1302
[12]   APPLICATION OF PROGRESSIVE OPTIMALITY ALGORITHM TO OPTIMAL HYDROTHERMAL SCHEDULING CONSIDERING DETERMINISTIC AND STOCHASTIC DATA [J].
NANDA, J ;
BIJWE, PR ;
KOTHARI, DP .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 1986, 8 (01) :61-64
[13]   Short-term operation scheduling of a hydropower plant in the day-ahead electricity market [J].
Perez-Diaz, Juan I. ;
Wilhelmi, Jose R. ;
Angel Sanchez-Fernandez, Jose .
ELECTRIC POWER SYSTEMS RESEARCH, 2010, 80 (12) :1535-1542
[14]   Using genetic algorithms for reservoir characterisation [J].
Romero, CE ;
Carter, JN .
JOURNAL OF PETROLEUM SCIENCE AND ENGINEERING, 2001, 31 (2-4) :113-123
[15]  
Shan Yu, 2011, 2011 Fourth International Symposium on Knowledge Acquisition and Modeling, P462, DOI 10.1109/KAM.2011.126
[16]  
Xuan Yingji, 2009, 2009 7th ACIS International Conference on Software Engineering Research, Management and Applications (SERA 2009), P25, DOI 10.1109/SERA.2009.26
[17]  
Yang Z, 2010, POWER SYSTEM PROTECT, V38, P59
[18]   Maximization of hydropower generation through the application of a linear programming model [J].
Yoo, Ju-Hwan .
JOURNAL OF HYDROLOGY, 2009, 376 (1-2) :182-187
[19]   Application of cultural algorithm to generation scheduling of hydrothermal systems [J].
Yuan, Xiaohui ;
Yuan, Yanbin .
ENERGY CONVERSION AND MANAGEMENT, 2006, 47 (15-16) :2192-2201