Construction management and economics: the epistemology of a multidisciplinary design science

被引:27
作者
Voordijk, Hans [1 ]
机构
[1] Univ Twente, Enschede, Netherlands
关键词
Epistemology; knowledge production; design science;
D O I
10.1080/01446190903117777
中图分类号
F [经济];
学科分类号
02 ;
摘要
Research in the field of construction management and economics (CME) can be characterized as a multidisciplinary design science. Results from the sciences and humanities are necessary inputs for this field of research that deals with design, production and operation of the built environment. The output of CME research as multidisciplinary design science consists of three types of solution concepts: empirical generalizations based on statistical data analysis (technological laws), concepts that specify what to do, if a certain result is to be attained under given circumstances (functional rules), and insights in the interrelationship between design, production and operation of the built environment and social practice (socio-technological understanding). Scientific justification of these solution concepts is obtained through testing them in the specific context of the built environment.
引用
收藏
页码:713 / 720
页数:8
相关论文
共 60 条
[1]   Decision support method for multi-criteria selection of bridge rehabilitation strategy [J].
Abu Dabous, Saleh ;
Alkass, Sabah .
CONSTRUCTION MANAGEMENT AND ECONOMICS, 2008, 26 (08) :883-893
[2]  
Agapiou A., 1995, CONSTRUCT MANAGE EC, V13, P353, DOI [10.1080/01446199500000039, DOI 10.1080/01446199500000039]
[3]  
[Anonymous], 2000, CONSTR MANAG ECON, DOI DOI 10.1080/014461900433131
[4]  
Austin S., 2000, CONSTR MANAG ECON, V18, P173, DOI [10.1080/014461900370807, DOI 10.1080/014461900370807]
[5]   Flowshop scheduling model for bespoke precast concrete production planning [J].
Benjaoran, Vacharapoom ;
Dawood, Nashwan ;
Hobbs, Brian .
CONSTRUCTION MANAGEMENT AND ECONOMICS, 2005, 23 (01) :93-105
[6]   THE UTILIZATION PROCESS - A CONCEPTUAL-FRAMEWORK AND SYNTHESIS OF EMPIRICAL-FINDINGS [J].
BEYER, JM ;
TRICE, HM .
ADMINISTRATIVE SCIENCE QUARTERLY, 1982, 27 (04) :591-622
[7]   A linear-discrete scheduling model for the resource-constrained project scheduling problem [J].
Bonnal, Pierre ;
Gourc, Didier ;
Hameri, Ari-Pekka ;
Lacoste, Germain .
CONSTRUCTION MANAGEMENT AND ECONOMICS, 2005, 23 (08) :797-814
[8]  
Boon M., 2006, INT STUD PHILOS SCI, V20, P27, DOI [10.1080/02698590600640992, DOI 10.1080/02698590600640992]
[9]  
Bresnen M, 2000, CONSTR MANAG ECON, V18, P819, DOI DOI 10.1080/014461900433104
[10]  
Bresnen M., 2000, CONSTR MANAG ECON, V18, P587, DOI [10.1080/014461900407392, DOI 10.1080/014461900407392]