共 50 条
[21]
Reheat furnace upgrade results in production increase
[J].
Iron and Steel Engineer,
1997, 74 (02)
:59-61
[22]
Modernization of the pusher-type furnace of the TKS hot strip mill in Bochum
[J].
STAHL UND EISEN,
2002, 122 (01)
:45-48
[23]
A NEW INTEGRATED CONTROL-SYSTEM FOR THE REHEATING FURNACE OF A HOT STRIP MILL
[J].
CONFERENCE RECORD OF THE 1989 IEEE INDUSTRY APPLICATIONS SOCIETY ANNUAL MEETING, PTS 1-2,
1989,
:1467-1471
[24]
REVAMPING OF REHEATING FURNACE OF HOT STRIP MILL AT WAKAYAMA-STEEL-WORKS
[J].
TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN,
1992, 78 (09)
:T165-T168
[25]
OUTLINE OF MODIFIED REHEATING FURNACE OF FUKUYAMA NO-2 HOT STRIP MILL
[J].
TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN,
1985, 71 (05)
:S341-S341
[26]
The integrated control system of DHCR operations and reheating furnace for hot strip mill
[J].
REVUE DE METALLURGIE-CAHIERS D INFORMATIONS TECHNIQUES,
1997, 94 (7-8)
:893-900
[28]
OPERATION CONTROLLING TECHNIQUE IN HOT METAL PRETREATMENT FURNACE
[J].
TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN,
1988, 74 (06)
:991-998
[29]
Evolution of blast furnace hot metal production in Germany
[J].
REVUE DE METALLURGIE-CAHIERS D INFORMATIONS TECHNIQUES,
2002, 99 (11)
:885-928