Post-Earthquake Rapid Inspection Planning for Bridges in Western Kentucky

被引:0
|
作者
Koike, Norimitsu [1 ]
Harik, Issam E. [2 ]
机构
[1] Aichi Inst Technol, Dept Civil Engn, Aichi, Japan
[2] Univ Kentucky, Lexington, KY 40506 USA
来源
INTERNATIONAL JOURNAL OF GEOMATE | 2012年 / 2卷 / 03期
关键词
Bridge ranking; Inspection Strategies; Post-earthquake inspection; Risk Potential;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper presents a methodology for the rapid assessment of bridge's safety and functionality following a major seismic event in rural areas. The proposed model considers a combination of the bridge ranking prior to the seismic event and a computer assist program to identify the "efficient completion time" strategy for the post-earthquake bridge inspection team to inspect the critical bridge's components damage level. Application of the proposed methodology is conducted on the Purchase Parkway in Western Kentucky. By setting the required inspection time to 40 minutes per bridge, it is estimated herein that a non-trained inspection team and without computer assist would conduct the inspection for all 61 bridges in a period exceeding 40 hours. On the other hand, by setting the time to 20 minutes for a well-trained team with computer assist, it will need 22 hours to inspect all 61 bridges, and 5 hours to inspect provisionally the 9 high risk bridges.
引用
收藏
页码:179 / 184
页数:6
相关论文
共 50 条
  • [21] Rapid damage mapping using post-earthquake satellite images
    Saito, K
    Spence, R
    IGARSS 2004: IEEE INTERNATIONAL GEOSCIENCE AND REMOTE SENSING SYMPOSIUM PROCEEDINGS, VOLS 1-7: SCIENCE FOR SOCIETY: EXPLORING AND MANAGING A CHANGING PLANET, 2004, : 2272 - 2275
  • [22] Post-Earthquake Prosperity
    XING ZHE
    China Today, 2006, (05) : 78 - 80
  • [23] Planning for Post-Earthquake Fires Considering Performance of Transportation and Water Networks
    Sarreshtehdari, Amir
    Coar, Max
    Khorasani, Negar Elhami
    LIFELINES 2022: ADVANCING LIFELINE ENGINEERING FOR COMMUNITY RESILIENCE, 2022, : 453 - 463
  • [24] Post-Earthquake Reconstruction Planning Using Land Readjustment in Bhuj (India)
    Byahut, Sweta
    JOURNAL OF THE AMERICAN PLANNING ASSOCIATION, 2014, 80 (04) : 440 - 441
  • [25] SHORT-TERM POST-EARTHQUAKE BUS TRANSIT PLANNING IN MANAGUA
    LAGO, AM
    TRANSPORTATION, 1976, 5 (02) : 135 - 152
  • [26] Data-driven post-earthquake rapid structural safety assessment
    Goulet, J. A.
    Michel, C.
    Kiureghian, A. Der
    EARTHQUAKE ENGINEERING & STRUCTURAL DYNAMICS, 2015, 44 (04): : 549 - 562
  • [27] Post-Earthquake Rapid Assessment Method for Electrical Function of Equipment in Substations
    Zhu, Wang
    Wu, Minger
    Xie, Qiang
    Chen, Yunlong
    IEEE TRANSACTIONS ON POWER DELIVERY, 2023, 38 (05) : 3312 - 3321
  • [28] Vaccination in post-earthquake crisis
    Wiwanitkit, Viroj
    HUMAN VACCINES, 2010, 6 (07): : 595 - 596
  • [29] Post-earthquake cordons and their implications
    Underwood, Greg
    Orchiston, Caroline
    Shrestha, Shakti R.
    EARTHQUAKE SPECTRA, 2020, 36 (04) : 1743 - 1768
  • [30] Post-earthquake dilatancy recovery
    Scholz, Christopher H.
    Geology, 1974, 2 (11): : 551 - 554