Optimal process integration architectures in off-site construction: Theorizing the use of multi-skilled resources

被引:51
作者
Arashpour, Mehrdad [1 ]
Wakefield, Ron [1 ]
Abbasi, Babak [2 ]
Arashpour, Mohammadreza [3 ]
Hosseini, Reza [4 ]
机构
[1] RMIT Univ, Sch Property Construct & Project Management, 360 Swanston St, Melbourne, Vic 3000, Australia
[2] RMIT Univ, Sch Business IT & Logist, Melbourne, Vic, Australia
[3] Azad Univ, Sch Engn Management, Tehran, Iran
[4] Deakin Univ, Sch Architecture & Built Environm, Geelong, Vic, Australia
关键词
Fuzzy-TOPSIS theory; modular prefabrication; off-site construction; precast process optimization; planning and control;
D O I
10.1080/17452007.2017.1302406
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The architecture, engineering and construction industry has long dealt with problems such as schedule and budget overruns, quality and safety issues, and low productivity. Off-site construction, which is a hybrid of manufacturing and construction, has significant potential to address industry's endemic problems. However, off-site construction has been criticized for replicating the traditional subcontracting approach and therefore fragmented practice in the construction industry. The current research focuses on process integration and cross-training of multi-skilled resources as a solution to the aforementioned problem. To identify optimal process integration architectures for off-site construction, production data of three off-site manufacturers were analyzed by using a hybrid of fuzzy theory and the technique for order of preference by similarity to ideal solution. Findings reveal that process integration architectures transferring excess capacity from under-utilized to over-utilized resources in direct or indirect pathways are preferable in terms of satisfying decision criteria such as time and cost of cross-training, skill transferability, compliance with network logic, and safety considerations. The study contributes to the off-site construction literature by providing insight into dynamics of using multi-skilled resources. It also contributes to practice by developing a customizable and user-friendly framework for off-site production managers in order to identify the optimal process integration architecture in their own production scenarios.
引用
收藏
页码:46 / 59
页数:14
相关论文
共 56 条
[1]   Dynamics of workforce skill evolution in construction projects [J].
Alvanchi, Amin ;
Lee, SangHyun ;
AbouRizk, Simaan M. .
CANADIAN JOURNAL OF CIVIL ENGINEERING, 2012, 39 (09) :1005-1017
[2]  
[Anonymous], 2015, GLOB FOR CONSTR IND
[3]  
Arashpour M, 2015, IMPLEMENTING INNOVATIVE IDEAS IN STRUCTURAL ENGINEERING AND PROJECT MANAGEMENT, P1121
[4]   Off-site construction optimization: Sequencing multiple job classes with time constraints [J].
Arashpour, Mehrdad ;
Wakefield, Ron ;
Abbasi, Babak ;
Lee, E. W. M. ;
Minas, James .
AUTOMATION IN CONSTRUCTION, 2016, 71 :262-270
[5]   Analysis of interacting uncertainties in on-site and off-site activities: Implications for hybrid construction [J].
Arashpour, Mehrdad ;
Wakefield, Ron ;
Lee, E. W. M. ;
Chan, Ricky ;
Hosseini, M. Reza .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2016, 34 (07) :1393-1402
[6]   Quantitative Analysis of Rate-Driven and Due Date-Driven Construction: Production Efficiency, Supervision, and Controllability in Residential Projects [J].
Arashpour, Mehrdad ;
Wakefield, Ron ;
Blismas, Nick ;
Abbasi, Babak .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2016, 142 (01)
[7]   State of offsite construction in India-Drivers and barriers [J].
Arif, M. ;
Bendi, D. ;
Sawhney, A. ;
Iyer, K. C. .
25TH INTERNATIONAL CONGRESS ON CONDITION MONITORING AND DIAGNOSTIC ENGINEERING (COMADEM 2012), 2012, 364
[8]   Fuzzy Enabled Hybrid Genetic Algorithm-Particle Swarm Optimization Approach to Solve TCRO Problems in Construction Project Planning [J].
Ashuri, Baabak ;
Tavakolan, Mehdi .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2012, 138 (09) :1065-1074
[9]  
Ballard G., 2002, PROC 10 ANN C INT GR, P6
[10]   Bucket brigades on in-tree assembly networks [J].
Bartholdi, JJ ;
Eisenstein, DD ;
Lim, YF .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 168 (03) :870-879