Optimal process integration architectures in off-site construction: Theorizing the use of multi-skilled resources

被引:49
作者
Arashpour, Mehrdad [1 ]
Wakefield, Ron [1 ]
Abbasi, Babak [2 ]
Arashpour, Mohammadreza [3 ]
Hosseini, Reza [4 ]
机构
[1] RMIT Univ, Sch Property Construct & Project Management, 360 Swanston St, Melbourne, Vic 3000, Australia
[2] RMIT Univ, Sch Business IT & Logist, Melbourne, Vic, Australia
[3] Azad Univ, Sch Engn Management, Tehran, Iran
[4] Deakin Univ, Sch Architecture & Built Environm, Geelong, Vic, Australia
关键词
Fuzzy-TOPSIS theory; modular prefabrication; off-site construction; precast process optimization; planning and control;
D O I
10.1080/17452007.2017.1302406
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The architecture, engineering and construction industry has long dealt with problems such as schedule and budget overruns, quality and safety issues, and low productivity. Off-site construction, which is a hybrid of manufacturing and construction, has significant potential to address industry's endemic problems. However, off-site construction has been criticized for replicating the traditional subcontracting approach and therefore fragmented practice in the construction industry. The current research focuses on process integration and cross-training of multi-skilled resources as a solution to the aforementioned problem. To identify optimal process integration architectures for off-site construction, production data of three off-site manufacturers were analyzed by using a hybrid of fuzzy theory and the technique for order of preference by similarity to ideal solution. Findings reveal that process integration architectures transferring excess capacity from under-utilized to over-utilized resources in direct or indirect pathways are preferable in terms of satisfying decision criteria such as time and cost of cross-training, skill transferability, compliance with network logic, and safety considerations. The study contributes to the off-site construction literature by providing insight into dynamics of using multi-skilled resources. It also contributes to practice by developing a customizable and user-friendly framework for off-site production managers in order to identify the optimal process integration architecture in their own production scenarios.
引用
收藏
页码:46 / 59
页数:14
相关论文
共 56 条
  • [1] Dynamics of workforce skill evolution in construction projects
    Alvanchi, Amin
    Lee, SangHyun
    AbouRizk, Simaan M.
    [J]. CANADIAN JOURNAL OF CIVIL ENGINEERING, 2012, 39 (09) : 1005 - 1017
  • [2] [Anonymous], 2015, GLOB FOR CONSTR IND
  • [3] Arashpour M, 2015, IMPLEMENTING INNOVATIVE IDEAS IN STRUCTURAL ENGINEERING AND PROJECT MANAGEMENT, P1121
  • [4] Off-site construction optimization: Sequencing multiple job classes with time constraints
    Arashpour, Mehrdad
    Wakefield, Ron
    Abbasi, Babak
    Lee, E. W. M.
    Minas, James
    [J]. AUTOMATION IN CONSTRUCTION, 2016, 71 : 262 - 270
  • [5] Analysis of interacting uncertainties in on-site and off-site activities: Implications for hybrid construction
    Arashpour, Mehrdad
    Wakefield, Ron
    Lee, E. W. M.
    Chan, Ricky
    Hosseini, M. Reza
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2016, 34 (07) : 1393 - 1402
  • [6] Quantitative Analysis of Rate-Driven and Due Date-Driven Construction: Production Efficiency, Supervision, and Controllability in Residential Projects
    Arashpour, Mehrdad
    Wakefield, Ron
    Blismas, Nick
    Abbasi, Babak
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2016, 142 (01)
  • [7] State of offsite construction in India-Drivers and barriers
    Arif, M.
    Bendi, D.
    Sawhney, A.
    Iyer, K. C.
    [J]. 25TH INTERNATIONAL CONGRESS ON CONDITION MONITORING AND DIAGNOSTIC ENGINEERING (COMADEM 2012), 2012, 364
  • [8] Fuzzy Enabled Hybrid Genetic Algorithm-Particle Swarm Optimization Approach to Solve TCRO Problems in Construction Project Planning
    Ashuri, Baabak
    Tavakolan, Mehdi
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2012, 138 (09) : 1065 - 1074
  • [9] Ballard G., 2002, PROC 10 ANN C INT GR, P6
  • [10] Bucket brigades on in-tree assembly networks
    Bartholdi, JJ
    Eisenstein, DD
    Lim, YF
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 168 (03) : 870 - 879