STREAMFLOW CHANGES AFTER CLEAR-CUT LOGGING OF A PINE BEETLE-INFESTED WATERSHED IN SOUTHERN BRITISH-COLUMBIA, CANADA

被引:52
作者
CHENG, JD
机构
关键词
D O I
10.1029/WR025i003p00449
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
引用
收藏
页码:449 / 456
页数:8
相关论文
共 19 条
[1]  
[Anonymous], P INT S FOR HYDR PEN
[2]   MORE STREAMFLOW AFTER A BARK BEETLE EPIDEMIC [J].
BETHLAHMY, N .
JOURNAL OF HYDROLOGY, 1974, 23 (3-4) :185-189
[3]   A REVIEW OF CATCHMENT EXPERIMENTS TO DETERMINE THE EFFECT OF VEGETATION CHANGES ON WATER YIELD AND EVAPO-TRANSPIRATION [J].
BOSCH, JM ;
HEWLETT, JD .
JOURNAL OF HYDROLOGY, 1982, 55 (1-4) :3-23
[4]  
CHENG JD, 1980, MAY P IHR INT C WAT
[5]  
CHENG JD, 1980, P S WATERSHED MANAGE, P240
[6]   MEASURES OF STREAMFLOW TIMING [J].
COURT, A .
JOURNAL OF GEOPHYSICAL RESEARCH, 1962, 67 (11) :4335-+
[7]  
DIXON WJ, 1969, INTRO STATISTICAL AN
[8]  
GOLDING DL, 1981, INTERIOR W WATERSHED, P107
[9]  
HELVEY JD, 1980, WATER RESOUR BULL, V16, P627
[10]  
HELVEY JD, 1978, PNW326 USDA FOR SERF