Research on the Grey Assessment System of Dam Failure Risk

被引:3
作者
Jiang Ying [1 ]
Zhang QiuWen [1 ]
机构
[1] Huazhong Univ Sci & Technol, Coll Hydropower & Informat Engn, Wuhan, Hubei, Peoples R China
基金
中国国家自然科学基金;
关键词
Dam Failure; Risk Analysis; Analytic Hierarchy Processing; Grey Theory; Assessment System;
D O I
10.4304/jcp.7.9.2334-2341
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The security of the dam is a vital problem for the reasonable use of the water resources. It is important and meaningful to research methods of protecting the safety of dam. So the dam safety assessment is related with the national economy and the people's livelihood, and it is necessary to build a system to evaluate the security risk of dam. The dam failure disaster risk is regarded as main researching object in this thesis. The theories and methods, such as knowledge of dam engineering, risk analysis, analytic hierarchy processing, grey theory and so on, are introduced into the thesis. This research performs relatively detailed study on methods of comprehensive risk assessment, synthesis assessment structure system, method of measuring assessment index of the dam, and development of the grey assessment system of Dam Failure Risk.
引用
收藏
页码:2334 / 2341
页数:8
相关论文
共 50 条
[31]   Towards preparedness for dam failure: An evidence base for risk communication for downstream communities [J].
Mehta, Amisha M. ;
Weeks, Clinton S. ;
Tyquin, Ellen .
INTERNATIONAL JOURNAL OF DISASTER RISK REDUCTION, 2020, 50
[32]   Hypothetical failure of the Khassa Chai dam and flood risk analysis for Kirkuk, Iraq [J].
Abdulrahman, Kawa Z. ;
Faris, Mariwan R. ;
Ibrahim, Hekmat M. ;
Yousif, Omed S. Q. ;
Ghafoor, Alan Abubaker ;
Othman, Luqman S. ;
Karakouzian, Moses .
NATURAL HAZARDS, 2022, 113 (03) :1833-1851
[33]   Research on Failure Prognostics Method of Electronic System Based on Improved Fruit Fly Algorithm and Grey Fast Relevance Vector Machine [J].
Wu, Kun ;
Kang, Jianshe ;
Wang, Xuan .
2016 8TH INTERNATIONAL CONFERENCE ON INTELLIGENT NETWORKING AND COLLABORATIVE SYSTEMS (INCOS), 2016, :94-98
[34]   Interval Analysis of the Loss of Life Caused by Dam Failure [J].
Ge, Wei ;
Wang, Xiuwei ;
Li, Zongkun ;
Zhang, Hexiang ;
Guo, Xinyan ;
Wang, Te ;
Gao, Weixing ;
Lin, Chaoning ;
van Gelder, Pieter .
JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT, 2021, 147 (01)
[35]   Research of Information Security Risk Prediction based on Grey Theory and ANP [J].
Yu, Qian ;
Shen, Yongjun .
PROCEEDINGS OF 2016 IEEE ADVANCED INFORMATION MANAGEMENT, COMMUNICATES, ELECTRONIC AND AUTOMATION CONTROL CONFERENCE (IMCEC 2016), 2016, :107-113
[36]   Research on Assessment System for Blockchain [J].
Pang, Weiwei ;
Wei, Kai ;
Zhang, Yihui ;
Jiang, Chunyu ;
Cheng, Yang ;
Zhang, Qi ;
Liu, Bin ;
Zhang, Lifeng ;
Liu, Tingting ;
Wu, Yinqian .
2023 IEEE 22ND INTERNATIONAL CONFERENCE ON TRUST, SECURITY AND PRIVACY IN COMPUTING AND COMMUNICATIONS, TRUSTCOM, BIGDATASE, CSE, EUC, ISCI 2023, 2024, :2187-2192
[37]   Element Failure Risk Assessment of Soil Slope [J].
Peng, Pu ;
Li, Ze ;
Zhang, Xiaoyan ;
Guo, Yakun ;
Zhao, Yigong .
INTERNATIONAL JOURNAL OF GEOMECHANICS, 2023, 23 (09)
[38]   Risk Assessment of Dam-Breach Flood Under Extreme Storm Events [J].
Lin, Xiajing ;
Huang, Guohe ;
Wang, Guoqing ;
Yan, Denghua ;
Zhou, Xiong .
FRONTIERS IN ENVIRONMENTAL SCIENCE, 2021, 9
[39]   Research The Deformation Prediction System of Foundation Pit Based on Grey Theory [J].
Wu, Qihong ;
Wan, Shiming ;
Yang, Youlian .
PROGRESS IN CIVIL ENGINEERING, PTS 1-4, 2012, 170-173 :174-178
[40]   Bayesian network of risk assessment for a super-large dam exposed to multiple natural risk sources [J].
Yu Chen ;
Pengzhi Lin .
Stochastic Environmental Research and Risk Assessment, 2019, 33 :581-592