LOG BUCKING AND LUMBER MANUFACTURING USING DYNAMIC-PROGRAMMING

被引:62
作者
FAALAND, B [1 ]
BRIGGS, D [1 ]
机构
[1] UNIV WASHINGTON,COLL FOREST RESOURCES,SEATTLE,WA 98195
关键词
D O I
10.1287/mnsc.30.2.245
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:245 / 257
页数:13
相关论文
共 27 条
[1]  
Avriel M., 2003, NONLINEAR PROGRAMMIN
[2]  
Bazaraa MS, 1979, NONLINEAR PROGRAMMIN
[3]  
BRIGGS DG, 1977, 30 U WASH I FOR PROD
[4]  
BRIGGS DG, 1980, THESIS U WASHINGTON
[5]  
CLEMMONS JW, 1966, P SOC AM FOR ANN M S, P197
[6]  
CROW CC, 1981, CROWS WEEKLY LE 0612
[7]  
DEADMAN MW, 1978, 20TH PROD FOR S FOR
[8]  
Dreyfus S. E., 1977, ART THEORY DYNAMIC P
[9]  
Faaland B, 1981, PARAMETRIC ANAL LIVE
[10]  
Faaland B., 1981, DYNAMIC PROGRAMMING