LOG BUCKING AND LUMBER MANUFACTURING USING DYNAMIC-PROGRAMMING

被引:61
作者
FAALAND, B [1 ]
BRIGGS, D [1 ]
机构
[1] UNIV WASHINGTON,COLL FOREST RESOURCES,SEATTLE,WA 98195
关键词
D O I
10.1287/mnsc.30.2.245
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:245 / 257
页数:13
相关论文
共 27 条
  • [1] Avriel M., 2003, NONLINEAR PROGRAMMIN
  • [2] Bazaraa MS, 1979, NONLINEAR PROGRAMMIN
  • [3] BRIGGS DG, 1977, 30 U WASH I FOR PROD
  • [4] BRIGGS DG, 1980, THESIS U WASHINGTON
  • [5] CLEMMONS JW, 1966, P SOC AM FOR ANN M S, P197
  • [6] CROW CC, 1981, CROWS WEEKLY LE 0612
  • [7] DEADMAN MW, 1978, 20TH PROD FOR S FOR
  • [8] Dreyfus S. E., 1977, ART THEORY DYNAMIC P
  • [9] Faaland B, 1981, PARAMETRIC ANAL LIVE
  • [10] Faaland B., 1981, DYNAMIC PROGRAMMING