COMPUTER TIME AND MEMORY REQUIREMENTS FOR DP AND DDDP IN WATER-RESOURCE SYSTEMS-ANALYSIS

被引:27
作者
CHOW, VT [1 ]
MAIDMENT, DR [1 ]
TAUXE, GW [1 ]
机构
[1] UNIV ILLINOIS,HYDROSYST LAB,URBANA,IL 61801
关键词
D O I
10.1029/WR011i005p00621
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
引用
收藏
页码:621 / 628
页数:8
相关论文
共 15 条
[1]  
Bellman R., 1957, DYNAMIC PROGRAMMING
[2]  
BURAS N, 1972, ENVIRONMENTAL SCIENC, P114
[3]  
Buras N., 1966, ADV HYDROSCI, V3, P367, DOI [10.1016/B978-0-12-021803-5.50014-1, DOI 10.1016/B978-0-12-021803-5.50014-1]
[4]  
Chow V.T., 1974, WATER RESOURCES PLAN, V78
[5]  
CHOW VT, 1969, CIVIL ENG STUD HY 22
[6]  
CHOW VT, 1971, 47 U ILL WAT RES CTR
[7]  
CORTESRIVERA G, 1973, THESIS U ILL
[8]  
HALL WA, 1961, J IRRIG DRAIN DIV AM, V87, P1
[9]   DISCRETE DIFFERENTIAL DYNAMIC PROGRAMING APPROACH TO WATER RESOURCES SYSTEMS OPTIMIZATION [J].
HEIDARI, M ;
CHOW, VT ;
KOKOTOVIC, PV ;
MEREDITH, DD .
WATER RESOURCES RESEARCH, 1971, 7 (02) :273-+
[10]  
HEIDARI M, 1971, CIVIL ENG STUD HY 24