Design of lean manufacturing systems using value stream mapping with simulation A case study

被引:111
作者
Gurumurthy, Anand [1 ]
Kodali, Rambabu [2 ]
机构
[1] Birla Inst Technol & Sci, Mech Engn Grp, Pilani, Rajasthan, India
[2] Birla Inst Technol & Sci, Mech Engn Grp & Engn Technol Grp, Pilani, Rajasthan, India
关键词
Lean production; Manufacturing systems; Computer software; Simulation; Performance measures;
D O I
10.1108/17410381111126409
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose - Generally, the implementation of lean manufacturing (LM) starts with the development of value stream maps. However, it has been found that value stream mapping (VSM) suffers from various shortcomings. Hence, researchers have suggested the use of simulation along with VSM. The purpose of this paper is to present an application of VSM with simulation during the design of lean manufacturing systems (LMS) using a case study of an organisation following a job shop production system to manufacture doors and windows. Design/methodology/approach - Simulation models were developed using QUeuing Event Simulation Tool for the case organisation to demonstrate how the case organisation will be changed after implementing various LM elements, apart from analysing the impact of implementing these LM elements on the organisation's performance. Findings - Simulation studies were carried out for different scenarios such as "before LM" (current state VSM) and "after LM" (future state VSM). It was found that the case organisation can achieve significant improvement in performance and can meet the increasing demand without any additional resources. Practical implications - It is believed that this paper will enable practitioners to appreciate the role of simulation in helping them understand how the operations department of the case organisation will be transformed during the design of LMS. Originality/value - According to the authors' knowledge, no case study exists in the literature that discusses the application of VSM with simulation in an organisation that manufactures doors and windows using a job shop production system. Furthermore, the paper simulates the impact of those LM elements which were not considered by other researchers on the performance measure of the case organisation.
引用
收藏
页码:444 / 473
页数:30
相关论文
共 71 条
[11]   An Exploratory Analysis in Applying Lean Manufacturing to a Labor-Intensive Industry in China [J].
Comm, Clare L. ;
Mathaisel, Dennis F. X. .
ASIA PACIFIC JOURNAL OF MARKETING AND LOGISTICS, 2005, 17 (04) :63-80
[12]   Implementing Lean in aerospace - challenging the assumptions and understanding the challenges [J].
Crute, V ;
Ward, Y ;
Brown, S ;
Graves, A .
TECHNOVATION, 2003, 23 (12) :917-928
[13]  
Cumbo D, 2006, FOREST PROD J, V56, P25
[14]  
Czabke J., 2007, THESIS
[15]  
CZARNECKI H, 2000, SIMULATION LEAN ASSE
[16]  
Dennis S, 2000, PROCEEDINGS OF THE 2000 WINTER SIMULATION CONFERENCE, VOLS 1 AND 2, P2015, DOI 10.1109/WSC.2000.899201
[17]   Quantifying benefits of conversion to lean manufacturing with discrete event simulation: a case study [J].
Detty, RB ;
Yingling, JC .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2000, 38 (02) :429-445
[18]  
Dhandapani V., 2004, INT J LOGISTICS RES, V7, P239
[19]   Materials flow improvement in a lean assembly line:: a case study [J].
Domingo, Rosario ;
Alvarez, Roberto ;
Pena, Marta Melodia ;
Calvo, Roque .
ASSEMBLY AUTOMATION, 2007, 27 (02) :141-147
[20]  
Duanmu J, 2007, PROCEEDINGS OF THE 2007 WINTER SIMULATION CONFERENCE, VOLS 1-5, P1612