Methods for improvement of clay slurry or sewage sludge

被引:34
作者
Chu, Jian [1 ]
Yan, Shuwang [2 ]
Lam, Kok Pang [3 ]
机构
[1] Nanyang Technol Univ, Sch Civil & Environm Engn, Singapore, Singapore
[2] Tianjin Univ, Geotech Res Inst, Tianjin, Peoples R China
[3] JTC Corp, Singapore, Singapore
关键词
geotechnical engineering; rehabilitation; reclamation & renovation; sewage treatment &; disposal;
D O I
10.1680/grim.11.00015
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
Clay slurry or sewage sludge may be used as fill materials for land reclamation. However, the treatment of very soft materials of high water content is difficult. One major difficulty is how to create a working platform on top of the slurry layer for required soil improvement works such as vacuum preloading to be carried out. Several methods that can be used to create a working platform on top of a slurry layer are reviewed in this paper. These include (1) sun drying; (2) capping with sand or other good soil; (3) use of geotextile; (4) cement mixing; and (5) dewatering using drainage. The advantages and disadvantages of each method are elaborated. Practical examples are given to illustrate the application of some of those methods. Sewage sludge is more difficult to treat because of its organic content and a combined chemical and mechanical method needs to be used. Two conceptual methods for using sewage sludge and other waste materials for land reclamation are also proposed.
引用
收藏
页码:187 / 199
页数:13
相关论文
共 24 条
[1]   Ground improvement techniques for railway embankments [J].
Arulrajah, A. ;
Abdullah, A. ;
Bo, M. W. ;
Bouazza, A. .
PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-GROUND IMPROVEMENT, 2009, 162 (01) :3-14
[2]   Instrumentation at Changi land reclamation project, Singapore [J].
Arulrajah, A. ;
Bo, M. W. ;
Chu, J. ;
Nikraz, H. .
PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-GEOTECHNICAL ENGINEERING, 2009, 162 (01) :33-40
[3]  
Arulrajah A., 2004, P I CIV ENG GROUND I, V8, P151, DOI DOI 10.1680/GRIM.2004.8.4.151
[4]   Reclamation and soil improvement on ultra-soft soil [J].
Bo, M. W. ;
Choa, V. ;
Wong, K. S. .
PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-GROUND IMPROVEMENT, 2005, 9 (01) :23-31
[5]   Preloading and prefabricated vertical drains design for foreshore land reclamation projects: a case study [J].
Bo, M. W. ;
Arulrajah, A. ;
Nikraz, H. .
PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-GROUND IMPROVEMENT, 2007, 11 (02) :67-76
[6]  
BROMS BB, 1987, GEOTEXT GEOMEMBRANES, V5, P17
[7]  
Burgos M, 2007, PROC MONOGR ENG WATE, P231
[8]   An experimental investigation of soil arching within basal reinforced and unreinforced piled embankments [J].
Chen, Yun-min ;
Cao, Wei-ping ;
Chen, Ren-peng .
GEOTEXTILES AND GEOMEMBRANES, 2008, 26 (02) :164-174
[9]  
Choa V., 2001, GROUND IMPROVEMENT, V5, P141
[10]   Improvement of ultra-soft soil using prefabricated vertical drains [J].
Chu, J. ;
Bo, M. W. ;
Choa, V. .
GEOTEXTILES AND GEOMEMBRANES, 2006, 24 (06) :339-348