Design for construction: utilizing production experiences in development

被引:40
作者
Gerth, Robert [1 ]
Boqvist, Albert [2 ]
Bjelkemyr, Marcus [3 ]
Lindberg, Bengt [1 ]
机构
[1] KTH Royal Inst Technol, Dept Prod Engn IIP, Brinellvagen 68, SE-10044 Stockholm, Sweden
[2] LTH Univ Lund, Dept Bldg & Environm Technol, Lund, Sweden
[3] MDH Malardalen Univ, Dept Innovat & Prod Realizat IPR, Eskilstuna, Sweden
关键词
Constructability; design for construction; feedback; lean construction; residential;
D O I
10.1080/01446193.2012.756142
中图分类号
F [经济];
学科分类号
02 ;
摘要
The design process has a significant impact on the performance and profitability of a housing project. Therefore, decisions made during the design process should take into consideration knowledge and experience from other processes in previously accomplished projects, specifically from the production phase. How to capture and use production experience in housing has not gained enough interest, possibly leading to suboptimal improvements during the construction process. This motivates research on how onsite production experience from similar previous projects can be captured and used to improve constructability without risking customer values. Based on the concept of constructability, 'design for manufacturing and assembly' and the theory of waste, the method 'design for construction' (DFC) has been developed. The four-step model complements the conventional construction process, and consists of the following steps: (1) specify customer values and similar previous projects; (2) identify onsite waste and cost drivers in previous projects; (3) develop criteria to evaluate constructability; and (4) evaluate constructability of the design. The DFC method is exemplified and tested through a case study, in which it was shown that the method facilitated identification of all problems that were considered in the investigated project. The method also highlighted other project obstacles that potentially could have been solved to improve constructability.
引用
收藏
页码:135 / 150
页数:16
相关论文
共 65 条
[1]  
Aggestam L., 2006, Information Technology and Control, V35, P297
[2]   A project control process in pre-construction phases Focus on effective methodology [J].
Al-Reshaid, Khaled ;
Kartam, Nabil ;
Tewari, Narendra ;
Al-Bader, Haya .
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2005, 12 (04) :351-+
[3]   Benchmarking the benchmarking models [J].
Anand, G. ;
Kodali, Rambabu .
BENCHMARKING-AN INTERNATIONAL JOURNAL, 2008, 15 (03) :257-291
[4]  
Anumba E. D., 2007, CONCURRENT ENG CONST
[5]   Constructability improvement in seawater intake structure [J].
Bakti, Erman ;
Majid, Muhd ;
Zin, Rosli ;
Trigunarsyah, Bambang .
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2011, 18 (06) :595-+
[6]   From craft production to mass customisation. Innovation requirements for the UK housebuilding industry [J].
Barlow, J .
HOUSING STUDIES, 1999, 14 (01) :23-42
[7]  
Belay A. M., 2009, WORLD ACAD SCI ENG T, V25, P240
[8]  
Berglund R., 2009, LEAN LEDNINGEN UTMAN
[9]   Strategies for overlapping dependent design activities [J].
Bogus, Susan M. ;
Molenaar, Keith R. ;
Diekmann, James E. .
CONSTRUCTION MANAGEMENT AND ECONOMICS, 2006, 24 (08) :829-837
[10]   Swedish construction culture, quality management and collaborative practice [J].
Bröchner, J ;
Josephson, PE ;
Kadefors, A .
BUILDING RESEARCH AND INFORMATION, 2002, 30 (06) :392-400