Optimal short-term hydrothermal generation scheduling using modified seeker optimisation algorithm

被引:5
作者
Krishnanand, K. R. [1 ]
Mohapatra, Ankita [2 ]
Panigrahi, B. K. [3 ]
Rout, Pravat Kumar [4 ]
Mallick, Manas Kumar [5 ]
机构
[1] Siksha O Anusandhan Univ, Multidisciplinary Res Cell, Bhubaneswar 751030, Orissa, India
[2] BPUT, Dept Elect Engn, Coll Engn & Technol, Rourkela 751003, Orissa, India
[3] IIT, Dept Elect Engn, Delhi 110016, India
[4] Siksha O Anusandhan Univ, ITER, Dept Elect & Elect Engn, Bhubaneswar 751030, Orissa, India
[5] Siksha O Anusandhan Univ, Dept Comp Sci & Engn, ITER, Bhubaneswar 751030, Orissa, India
关键词
short-term hydrothermal scheduling; global optimum solution; modified seeker optimisation algorithm; MSOA; contracting step-length; prohibited operating zones valve-point loading;
D O I
10.1504/IJMIC.2012.046403
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This paper presents a new evolutionary optimisation algorithm to solve the short-term hydrothermal generation problem with operational constraints using the modified seeker optimisation algorithm. Seeker optimisation algorithm is a recently developed empirical gradient based, meta-heuristic optimisation algorithm, which draws inspiration from the random process of human search strategy. In this paper, we improvise the step length determination strategy in the classical seeker optimisation method by considering an optimistically contracting step length calculation. The proposed methodology easily takes care of solving non-linear hydrothermal generation problem along with different constraints like power balance, capacity limits, valve-point loading and prohibited operating zones. Simulations were performed over various standard test cases and a comparative study is carried out with other existing relevant approaches. The result obtained reveals the robustness and ability of the proposed methodology over other existing techniques.
引用
收藏
页码:250 / 258
页数:9
相关论文
共 15 条
  • [1] HYDROELECTRIC GENERATION SCHEDULING WITH AN EFFECTIVE DIFFERENTIAL DYNAMIC-PROGRAMMING ALGORITHM
    CHANG, SC
    CHEN, CH
    FONG, IK
    LUH, PB
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 1990, 5 (03) : 737 - 743
  • [2] Hybrid PSO and DE approach for dynamic economic dispatch with non-smooth cost functions
    Chung, T. S.
    Lau, T. W.
    [J]. INTERNATIONAL JOURNAL OF MODELLING IDENTIFICATION AND CONTROL, 2009, 8 (04) : 317 - 326
  • [3] Dai CH, 2007, LECT NOTES ARTIF INT, V4456, P167
  • [4] Reactive power dispatch considering voltage stability with seeker optimization algorithm
    Dai, Chaohua
    Chen, Weirong
    Zhu, Yunfang
    Zhang, Xuexia
    [J]. ELECTRIC POWER SYSTEMS RESEARCH, 2009, 79 (10) : 1462 - 1471
  • [5] An improved PSO technique for short-term optimal hydrothermal scheduling
    Hota, P. K.
    Barisal, A. K.
    Chakrabarti, R.
    [J]. ELECTRIC POWER SYSTEMS RESEARCH, 2009, 79 (07) : 1047 - 1053
  • [6] Kennedy J, 1995, 1995 IEEE INTERNATIONAL CONFERENCE ON NEURAL NETWORKS PROCEEDINGS, VOLS 1-6, P1942, DOI 10.1109/icnn.1995.488968
  • [7] A genetic algorithm modelling framework and solution technique for short term optimal hydrothermal scheduling - Discussion
    Orero, SS
    Irving, MR
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 1998, 13 (02) : 517 - 518
  • [8] Shi Y., 1998, P 1998 IEEE INT C EV, P69
  • [9] Fast evolutionary programming techniques for short-term hydrothermal scheduling
    Sinha, N
    Chakrabarti, R
    Chattopadhyay, PK
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2003, 18 (01) : 214 - 220
  • [10] Modified PSO and wavelet transform-based fault classification on transmission systems
    Upendar, J.
    Gupta, C. P.
    Singh, G. K.
    [J]. INTERNATIONAL JOURNAL OF BIO-INSPIRED COMPUTATION, 2010, 2 (06) : 395 - 403