共 16 条
[1]
Covert R. P., 1973, AIIE Transactions, V5, P323, DOI 10.1080/05695557308974918
[2]
ITERATIVE PROCEDURE FOR SINGLE-MACHINE MULTI-PRODUCT LOT SCHEDULING PROBLEM
[J].
MANAGEMENT SCIENCE SERIES A-THEORY,
1973, 20 (01)
:50-55
[3]
DUERMEYER BL, 1979, OPER RES, V27, P935
[4]
DUERMEYER BL, 1980, NAV RES LOG, V27, P177
[7]
FUJITA S, 1978, AIIE T, V12, P87
[8]
Ghare P.M., 1963, J IND ENG, V14, P238
[9]
HAESSLER RW, 1979, AIIE T, V11, P336, DOI 10.1080/05695557908974480
[10]
MISRA RB, 1975, INT J PROD RES, V13, P445