共 28 条
[11]
Hoffman T., Assembly line balancing: A set of challenging problems, International Journal of Production Research, 28, 10, pp. 1807-1815, (1990)
[12]
Johnson R.V., Assembly line balancing algorithm: Computer comparison, International Journal of Production Research, 19, 3, pp. 277-287, (1981)
[13]
Johnson R.V., A branch and bound algorithm for assembly line balancing problems with formulation irregularities, Management Science, 29, 11, pp. 1309-1324, (1983)
[14]
Ketchman M.C., Watt J., Parametric simulation for flexible assembly system, Journal of Manufacturing Systems, 8, 2, pp. 115-124, (1989)
[15]
Kilbridge M.D., Wester L., A review of analytical systems of line balancing, Operations Research, 10, pp. 626-638, (1962)
[16]
Kusiak A., The production equipment requirement problem, International Journal of Production Research, 25, 3, pp. 319-325, (1987)
[17]
Lehman M., On criteria for assigning models to assembly lines, International Journal of Production Research, 7, 4, pp. 269-285, (1969)
[18]
(1988)
[19]
Miller D.M., Davis R.P., The machine requirement problems, International Journal of Production Research, 15, 2, pp. 219-231, (1977)
[20]
Miller D.M., Davis R.P., A dynamic resource allocation model fora machine requirement problem, AIIE Transactions, 10, pp. 237-243, (1978)