共 50 条
- [41] An improved PSO algorithm for resource-constrained project scheduling problem WCICA 2006: SIXTH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-12, CONFERENCE PROCEEDINGS, 2006, : 3514 - +
- [42] Heuristic algorithm for flexible resource-constrained project scheduling problem Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2015, 21 (07): : 1846 - 1855
- [44] Using Firefly Algorithm to Solve Resource Constrained Project Scheduling Problem PROCEEDINGS OF SEVENTH INTERNATIONAL CONFERENCE ON BIO-INSPIRED COMPUTING: THEORIES AND APPLICATIONS (BIC-TA 2012), VOL 1, 2013, 201 : 417 - +
- [46] An estimation of distribution algorithm for resource-constrained project scheduling problem 2010 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-5, 2010, : 265 - 270
- [48] A New Resource Constrained Project Scheduling Problem 2009 ASIA-PACIFIC CONFERENCE ON INFORMATION PROCESSING (APCIP 2009), VOL 1, PROCEEDINGS, 2009, : 476 - +
- [49] Resource Constrained Project Scheduling Problem Based on Improved Ant Colony Algorithm 26TH CHINESE CONTROL AND DECISION CONFERENCE (2014 CCDC), 2014, : 1560 - 1563
- [50] A Hybrid Genetic Algorithm for the Resource Constrained Multi-Project Scheduling Problem ETFA 2005: 10TH IEEE INTERNATIONAL CONFERENCE ON EMERGING TECHNOLOGIES AND FACTORY AUTOMATION, VOL 2, PROCEEDINGS, 2005,