This Paper describes the pipeline carrying gas from the British Gas pipeline leaving the Barrow Terminal to supply the new gas fired combined heat/power plant installed by British Nuclear Fuels Ltd at their Sellafield plant. This passes through several environmentally sensitive areas, and the Paper describes fully how one of these, the crossing of the Duddon Estuary, was undertaken.