Business process management: establishing and maintaining project alignment

被引:25
作者
Box, Simon [1 ]
Platts, Ken [1 ]
机构
[1] Univ Cambridge, Inst Mfg, Mill Lane, Cambridge, England
关键词
Project management; Strategic alignment; Business process re-engineering; Change management;
D O I
10.1108/14637150510609408
中图分类号
F [经济];
学科分类号
02 ;
摘要
Purpose - The aim of the research was to develop a model for establishing and maintaining alignment of purpose in business change initiatives. Design/methodology/approach - The research methodology combined a synthesis of the literature across the diverse fields of change leadership, project management, and organisational alignment; and a parallel analysis of two industrial case studies. Findings - From an analysis of the cases, and a synthesis of the literature, a Project Alignment Model was developed. To help industrial project leaders operationalise the model and hence maintain alignment in their projects, the key points from the Project Alignment Model are also presented as a checklist. Practical implications - Managing change is increasingly relevant for all industries and companies, and the rate of change is predicted to increase. Project managers in this environment must have more than just technical delivery skills; they need to be good leaders, capable of influencing strategic direction, and skilled in managing the political dimensions of their projects. The model presented will help these leaders improve their change management capability. Originality/value - The developed model can be useful both as a descriptive model and as a prescriptive model. Used descriptively, the model can help structure the analysis of change projects. As such it could be a useful research instrument. Academics could use the model to analyse change projects and structure their findings in a way that allows ready cross-case comparisons. Such an approach can, by categorisation, lead to a more detailed understanding of the factors affecting project alignment and successful change. Used prescriptively, the model can guide project managers in creating and maintaining project alignment, and in doing so increase their chance of success in implementing change.
引用
收藏
页码:370 / 387
页数:18
相关论文
共 50 条
[21]   Strategic alignment of project management with health, safety and environmental management [J].
Ershadi, Mohammad Javad ;
Edrisabadi, Reza ;
Shakouri, Aghileh .
BUILT ENVIRONMENT PROJECT AND ASSET MANAGEMENT, 2020, 10 (01) :78-93
[22]   Business process modeling, implementation, analysis, and management: the case of business process management tools [J].
Zuhaira, Behjat ;
Ahmad, Naveed .
BUSINESS PROCESS MANAGEMENT JOURNAL, 2021, 27 (01) :145-183
[23]   PROCESS MANAGEMENT APPLIED TO PROJECT MANAGEMENT: A METHODOLOGY FOR PROJECT MANAGEMENT IN INDUSTRY [J].
Kipper, Liane Mahlmann ;
Benitez Nara, Elpidio Oscar ;
Mendes, Fabricio Izaguirre .
SISTEMAS & GESTAO, 2013, 8 (04) :402-414
[24]   The Importance of Managing Strategic IT Project Contracts Using a Business Process Approach [J].
Adler, Terry R. ;
Pittz, Thomas G. .
INTERNATIONAL JOURNAL OF INFORMATION TECHNOLOGY PROJECT MANAGEMENT, 2016, 7 (04) :52-63
[25]   A case study applying process and project alignment methodology [J].
INESC-ID, CSI / Universidade do Algarve, Campus de Gambelas, Faro ;
Zip 8005-139, Portugal ;
不详 ;
Zip 1000-029, Portugal .
J. Braz. Comput. Soc., 2006, 3 (65-82) :65-82
[26]   A framework for business process management [J].
van Rensburg, A .
COMPUTERS & INDUSTRIAL ENGINEERING, 1998, 35 (1-2) :217-220
[27]   Investigating the role of an enterprise architecture project in the business-IT alignment in Iran [J].
Alaeddini, Morteza ;
Salekfard, Sepideh .
INFORMATION SYSTEMS FRONTIERS, 2013, 15 (01) :67-88
[28]   PROJECT SCOPE MANAGEMENT PROCESS [J].
Derenskaya, Yana .
BALTIC JOURNAL OF ECONOMIC STUDIES, 2018, 4 (01) :118-125
[29]   A SOFTWARE FOR PROJECT MANAGEMENT PROCESS [J].
Banica, Logica ;
Rosca, Doina ;
Stefan, Cristian .
PROCEEDINGS OF THE ROMANIAN ACADEMY SERIES A-MATHEMATICS PHYSICS TECHNICAL SCIENCES INFORMATION SCIENCE, 2009, 10 (02) :179-187
[30]   Alignment is not enough: Integrating business and information technology management with the balanced business scorecard [J].
Van der Zee, JTM ;
De Jong, B .
JOURNAL OF MANAGEMENT INFORMATION SYSTEMS, 1999, 16 (02) :137-156