Management and reliability of construction programs

被引:0
作者
Velichkin, V. Z. [1 ]
机构
[1] St Petersburg Polytech Univ, St Petersburg, Russia
来源
MAGAZINE OF CIVIL ENGINEERING | 2014年 / 51卷 / 07期
关键词
probability of program execution; the probability value; schedule; reliability; parameter control; payment terms; time reserves; risks; structural redundancy; management efficiency;
D O I
10.5862/MCE.51.9
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The paper proposes a special kind of function of beta probability density distribution of the random variable to estimate probability of execution of the construction program in full and within the given timeframe. This function allows us to consider the impact of the effectiveness of the control system on the probability of the program execution in time. To achieve a high level of reliability of the realization of the construction program (at least 0.9), the strategies for performance of preliminary requirements for management system, accounting reserves of time and building structural redundancy in the organization of construction were proposed. Examples of the corresponding estimates are given.
引用
收藏
页码:74 / 79
页数:8
相关论文
共 32 条
  • [1] Abdullayev G.I., 2010, MAGAZINE CIVIL ENG, P59
  • [2] Abdullayev G.I., 2013, MAGAZINE CIVIL ENG, P43
  • [3] Abdullayev G.I., 2009, MAGAZINE CIVIL ENG, P62
  • [4] Abdullayev G.I., 2009, MAGAZINE CIVIL ENG, P53
  • [5] Absalyamov D. R, 2012, MAGAZINE CIVIL ENG, P39
  • [6] Afanasyev V.A., 1990, POTOCHNAYA ORG STROI, P203
  • [7] [Anonymous], 1989, 2700289 GOST
  • [8] [Anonymous], 1990, AUT AN
  • [9] [Anonymous], 1989, AUT CONTR
  • [10] Ansoff I. A., 2006, STRATEGICHESKOYE UPR