Value through innovation in long-term service delivery Facility management in an Australian PPP

被引:17
作者
Brewer, Graham [1 ]
Gajendran, Thayaparan [1 ]
Jefferies, Marcus [1 ]
McGeorge, Denny [1 ]
Rowlinson, Steve [2 ]
Dainty, Andrew [3 ]
机构
[1] Univ Newcastle, Sch Architecture & Built Environm, Callaghan, NSW, Australia
[2] Univ Hong Kong, Dept Real Estate & Construct, Hong Kong, Hong Kong, Peoples R China
[3] Loughborough Univ, Sch Civil & Bldg Engn, Loughborough, Leics, England
关键词
PPP; Facility management; Service delivery; Australia;
D O I
10.1108/BEPAM-03-2012-0008
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Purpose - Public-private partnerships (PPPs) and other innovative procurement mechanisms are frequently used to deliver both an asset and a public service over a protracted period. The value streams to the parties involved can be complex, but generally arise from the satisfactory provision of infrastructure that is fit for purpose throughout its life. This research aims to investigate the effectiveness of the facility management (FM) function in delivering long-term value to both the client and consortium. Design/methodology/approach - This paper describes a case study of a PPP in Australia that delivered social infrastructure in multiple locations to a state government. Drawing upon multiple perspectives from within the consortium, it utilises inductive principles to identify the influences on value generation through innovation by the FM function. Findings - The ability of an Australian FM contractor to provide value within a PPP context has been shown to reflect some of the attributes described in literature. However, the extent of innovation, especially in the design and construction phases, has been limited by organisational history and capability, and relational and contextual issues. Originality/value - This research highlights a flaw in the rhetoric relating to PPP delivery, namely the disconnection between the asset delivery and service delivery phases, which stifles the consortium's capacity to innovate and maximise value. It reveals a set of influences that both resonate with the literature and plausibly explain the suboptimal performance of the FM function within an Australian PPP. By using highly iterative analysis leading to within-case generalisability, it provides a robust basis for wider investigation of the problem.
引用
收藏
页码:74 / 88
页数:15
相关论文
共 41 条
[1]  
Akintoye A., 1998, ENG CONSTR ARCHIT MA, V5, P9, DOI [DOI 10.1108/eb021056, DOI 10.1108/EB021056]
[2]  
Ayers I, 1992, RESPONSIVE REGULATIO
[3]  
Babcock R.R., 2002, BUILDINGS, V96, P36
[4]  
Barrett P., 1995, FACILITIES MANAGEMEN
[5]   Methodological strategies to gain insights into informality and emergence in construction project case studies [J].
Barrett, Peter ;
Sutrisna, Monty .
CONSTRUCTION MANAGEMENT AND ECONOMICS, 2009, 27 (10) :935-948
[6]   The structural, social, and strategic factors associated with successful business networks [J].
Besser, Terry L. ;
Miller, Nancy .
ENTREPRENEURSHIP AND REGIONAL DEVELOPMENT, 2011, 23 (3-4) :113-133
[7]  
Bresnen M., 2002, INT J PROJ MANAG, V20, P497, DOI DOI 10.1016/S0263-7863(01)00043-6
[8]  
Brewer G.J., 2012, P JOINT CIB W070 W09
[9]  
Brown A., 2001, FACILITIES, V19, P119
[10]  
BUXBAUM JN, 2007, 0702 USC KEST I PUBL