EXPERT SCHEDULING SYSTEM FOR TOOL ROOM OPERATIONS

被引:1
作者
SHIVATHAYA, SS
FANG, XD
机构
[1] Department of Mechanical Engineering, University of Wollongong, NSW
关键词
D O I
10.1080/09511929508944651
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Operation scheduling for a tool room is a complex task because each set of tools has a unique operation sequence, and tool components are to be produced by attaching priorities depending on various technical aspects, such as the production methods, intricacy and complexity of tool components, dimensional tolerances, requirement of heat treatment, sub-assembly, final-assembly, try-out, etc. This paper discusses the design of a prototype knowledge-based scheduling system which utilizes quantitative factors, such as the estimated/actual operation times, the due dates and the resource availability, as well as non-quantitative factors, such as the nature of the order, the importance of the tool, the relative priorities of various tool components, etc. The non-quantitative factors are determined by the expert scheduler, based on his experience amassed over a long period of time. This expert system can be used on- or off-line and is characterized by IF-THEN rules. In an existing CAPP system this could be integrated to utilize master scheduling and process planning information for detailed operation scheduling.
引用
收藏
页码:247 / 254
页数:8
相关论文
共 15 条
[1]   Survey of constraint based scheduling systems using an artificial intelligence approach [J].
Atabakhsh, H. .
International journal for artificial intelligence in engineering, 1991, 6 (02) :58-73
[2]  
Boley H., 1990, Expert Systems, V7, P2, DOI 10.1111/j.1468-0394.1990.tb00158.x
[3]   TOOL MANAGEMENT FOR FLEXIBLE MANUFACTURING [J].
CHAN, BWM .
INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 1992, 5 (4-5) :255-265
[4]   AN APPROACH TO SHORT INTERVAL SCHEDULING FOR DISCRETE PARTS MANUFACTURING [J].
CHRYSSOLOURIS, G ;
DICKE, K ;
LEE, M .
INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 1991, 4 (03) :157-168
[5]   A KNOWLEDGE-BASED APPROACH TO DYNAMIC JOB-SHOP SCHEDULING [J].
FARHOODI, F .
INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 1990, 3 (02) :84-95
[6]  
FOX MS, 1984, P SME EMTAS 84 C, P236
[7]  
IWATA K, 1988, ANN CIRP, V37, P439
[8]  
KEMPF K, 1991, AI MAG, V11, P37
[9]  
KENG NP, 1988, 2ND P INT C EXP SYST, P57
[10]  
LAARHOVEN PJM, 1992, OPER RES, V40, P113