Investigating the use of green design parameters in UAE construction projects

被引:15
|
作者
Gharzeldeen, Monia N. [1 ]
Beheiry, Salwa M. [2 ]
机构
[1] Amer Univ Sharjah, Engn Syst Management Masters Program, Sharjah, U Arab Emirates
[2] Amer Univ Sharjah, Dept Civil Engn, Sharjah, U Arab Emirates
关键词
engineering design; green design parameters; sustainable construction; UAE;
D O I
10.1080/19397038.2014.895066
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Construction practices tend to have an adverse impact on the environment through their contribution to CO2 emission, increased waste and energy consumption. The United Arab Emirates (UAE) has launched many initiatives to encourage green design over the past years and to work towards a sustainable community. Nonetheless, such initiatives require a considerable amount of time to penetrate the professional psyche and showcase real results that are easily utilised by the construction community. The aim of this research was to study the current degree of use of Green Design Parameters (GDPs) in the UAE construction projects and to identify the main constraints that hinder their application. To achieve the study's objective, a survey was designed and distributed to engineering design professionals in different consulting and contracting companies in the seven emirates of the UAE. Feedback from 112 projects was examined and statistically analysed. The analysis showed a degree of awareness and use of some key GDPs. Moreover, the data showed no correlation between the degree of using GDPs in a project and its cost and schedule. Not surprisingly, the lack of knowledge about green parameters and the lack of trust in recycled materials are the main constraints that featured in the responses.
引用
收藏
页码:93 / 101
页数:9
相关论文
共 50 条
  • [21] The challenges of sustainable construction projects delivery - evidence from the UAE
    Ahmed, Salma
    El-Sayegh, Sameh
    ARCHITECTURAL ENGINEERING AND DESIGN MANAGEMENT, 2022, 18 (03) : 299 - 312
  • [22] Investigating the Components of Innovation in Construction Projects
    Ozorhon, Beliz
    Oral, Kutluhan
    Demirkesen, Sevilay
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2016, 32 (03)
  • [23] A dynamic approach for investigating design approaches to reducing construction waste in healthcare projects
    Meshref, Ahmed Nouh
    Ibrahim, Abdelazim
    JOURNAL OF BUILDING ENGINEERING, 2024, 95
  • [24] Identification of project cultural factors affecting the performance of UAE construction projects
    Mohammed, Adel Khalifa
    Bin Ishak, Md Sayuti
    ALEXANDRIA ENGINEERING JOURNAL, 2024, 86 : 205 - 216
  • [25] Factors influencing the selection of delay analysis methods in construction projects in UAE
    Abdelhadi, Yazeed
    Dulaimi, Mohammed Fadhil
    Bajracharya, Arun
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2019, 19 (04) : 329 - 340
  • [26] Improving performance of labourers in the construction projects of UAE: a multi cultural perspective
    Khan, Asadullah
    INTERNATIONAL JOURNAL OF INDIAN CULTURE AND BUSINESS MANAGEMENT, 2014, 9 (04) : 409 - 433
  • [27] Key Success Factors Impacting the Success of Innovation in UAE Construction Projects
    Faried, Mansour
    Saad, Malak
    Almarri, Khalid
    PROCEEDINGS OF 3RD INTERNATIONAL SUSTAINABLE BUILDINGS SYMPOSIUM (ISBS 2017), VOL 2, 2018, 7 : 482 - 505
  • [28] Investigating the overhead costs in construction projects in Palestine
    Enshassi, Adnan
    Aziz, Abdul
    El Karriri, Ala'a
    JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2008, 13 (01) : 35 - +
  • [29] Use of Earned Value Management in the UAE Construction Industry
    Morad, Mohamed
    El-Sayegh, Sameh M.
    2016 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING, MANAGEMENT SCIENCE AND APPLICATIONS (ICIMSA), 2016,
  • [30] Elements and Factors Affecting the Predictability of Fast-Track Construction Projects in UAE
    Al Ali, Mariam
    Mantha, Bharadwaj R. K.
    Abu Dabous, Saleh
    PROCEEDINGS OF 6TH INTERNATIONAL CONFERENCE ON CIVIL ENGINEERING AND ARCHITECTURE, VOL 2, ICCEA 2023, 2024, 531 : 331 - 345