RPERT: Repetitive-Projects Evaluation and Review Technique

被引:11
作者
Aziz, Remon Fayek [1 ]
机构
[1] Alexandria Univ, Struct Engn Dept, Fac Engn, Alexandria, Egypt
关键词
Repetitive Construction Projects; Program Evaluation and Review Technique; PERT Activity; Optimistic Duration; Pessimistic Duration; Most likely Duration; Expected Duration; Critical Path; Software;
D O I
10.1016/j.aej.2013.08.003
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Estimating expected completion probability of any repetitive construction project with a specified/certain duration including repetitive identical activities by using program evaluation and review technique is the most essential part in construction areas since the activities were had optimistic, most likely and pessimistic durations. This paper focuses on the calculation of expected completion probability of any repetitive construction project within a specified/certain duration (contract duration) by using Line Of Balance technique (LOB) in case of single or multiple number of crews integrated with Program Evaluation and Review Technique (PERT). Repetitive-Projects Evaluation and Review Technique (RPERT), which is a simplified software, will generate the expected project completion probability of a specified/certain duration (contract duration). RPERT software is designed by java programming code system to provide a number of new and unique capabilities, including: (1) Viewing the expected project completion probability according to a set of specified durations per each identical activity (optimistic time, most likely time, and pessimistic time) in the analyzed project; (2) Providing seamless integration with available project time calculations. In order to provide the aforementioned capabilities of RPERT, the system is implemented and developed in four main modules: (1) A user interface module; (2) A database module; (3) A running module; and (4) A processing module. At the end, an illustrative example will be presented to demonstrate and verify the applications of proposed software (RPERT), by using probabilistic calculations for repetitive construction projects. (C) 2013 Production and hosting by Elsevier B.V. on behalf of Faculty of Engineering, Alexandria University.
引用
收藏
页码:81 / 93
页数:13
相关论文
共 35 条
[21]   Progress Risk Assessment for Spliced Network of Engineering Project Based on Improved PERT [J].
Li Wenying ;
Liu Xiaojun .
ENGINEERING AND RISK MANAGEMENT, 2011, 1 :271-278
[22]   Simplified CPM/PERT simulation model [J].
Lu, M ;
AbouRizk, SM .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2000, 126 (03) :219-226
[23]   Revisiting the PERT mean and variance [J].
Manuel Herrerias-Velasco, Jose ;
Herrerias-Pleguezuelo, Rafael ;
Rene van Dorp, Johan .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2011, 210 (02) :448-451
[24]  
Mehtotra K., 1996, J OPERATIONS MANAGEM, V14, P277
[25]   A new method for constructing a minimal PERT network [J].
Mouhoub, Nasser Eddine ;
Benhocine, Abdelhamid ;
Belouadah, Hocine .
APPLIED MATHEMATICAL MODELLING, 2011, 35 (09) :4575-4588
[26]  
Pillai A. S., 1995, International Journal of Project Management, V13, P39, DOI 10.1016/0263-7863(95)95702-F
[27]  
Pontrandolfo P., 2000, International Journal of Project Management, V18, P215, DOI 10.1016/S0263-7863(99)00015-0
[28]   An approximation of the activity duration distribution in PERT [J].
Premachandra, IM .
COMPUTERS & OPERATIONS RESEARCH, 2001, 28 (05) :443-452
[29]  
Ronald C., 2002, BLUEPRINT PROJECT RE
[30]  
Seal K., 2003, TRANSCATIONS ED, V2, P16