WARRANTY COST ESTIMATION - A GOAL PROGRAMMING APPROACH

被引:19
作者
MITRA, A [1 ]
PATANKAR, JG [1 ]
机构
[1] UNIV AKRON,DEPT MANAGEMENT,AKRON,OH 44325
关键词
D O I
10.1111/j.1540-5915.1988.tb00276.x
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:409 / 423
页数:15
相关论文
共 16 条
  • [1] AMATO HN, 1976, ACCOUNT REV, V51, P854
  • [2] DETERMINATION OF WARRANTY RESERVES - AN EXTENSION
    AMATO, HN
    ANDERSON, EE
    [J]. MANAGEMENT SCIENCE, 1976, 22 (12) : 1391 - 1394
  • [3] OPTIMAL PRICE AND PROTECTION PERIOD DECISIONS FOR A PRODUCT UNDER WARRANTY
    GLICKMAN, TS
    BERGER, PD
    [J]. MANAGEMENT SCIENCE, 1976, 22 (12) : 1381 - 1390
  • [4] HAHN GJ, 1968, STATISTICAL MODELS E
  • [5] Henley E. J., 1981, RELIABILITY ENG RISK
  • [6] HESCHEL MS, 1971, IND ENG, V3, P14
  • [7] KAO JHK, 1960, 6TH P NAT S REL QUAL
  • [8] Kotz S., 1970, CONTINUOUS UNIVARIAT, V1
  • [9] LOWERRE JM, 1968, J IND ENGINEERING, V19, P359
  • [10] MENKE WW, 1969, MANAGE SCI, V15, P542