OPTIMIZING SPILLWAY CAPACITY WITH UNCERTAINTY IN FLOOD ESTIMATOR

被引:21
作者
AFSHAR, A
MARINO, MA
机构
[1] Dept. of Land, Air and Water Resour., Univ. of California, Davis, CA
[2] Dept. of Land, Air and Water Resour., Dept. of Civ. Engrg., Univ. of California, Davis, CA
来源
JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT-ASCE | 1990年 / 116卷 / 01期
关键词
D O I
10.1061/(ASCE)0733-9496(1990)116:1(71)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The spillway design flood is a function of social, moral, economic, and technological restrictions. Given the significant initial cost of a spillway and the very high cost of dam failure and downstream damages, the economic sizing of the spillway becomes a very important decision. This paper presents a model that minimizes the social cost of a spillway. The model incorporates the uncertainty of the flood magnitude estimator in the optimization of spillway capacity, using an estimated flood probability density function and a relationship between spillway capacity and cost. The spillway design flood is explicitly treated as a decision variable, which is useful in the planning phase of a reservoir. To determine the effect of uncertainty in the flood magnitude estimator, the optimum spillway design flood is examined for different flood probability density functions with varying sample sizes. It is shown that with a limited sample size, the optimum spillway design flood may be as high as the probable maximum flood. © ASCE.
引用
收藏
页码:71 / 84
页数:14
相关论文
共 21 条
[1]   EVALUATION OF UNCERTAINTY IN FLOOD MAGNITUDE ESTIMATOR ON ANNUAL EXPECTED DAMAGE COSTS OF HYDRAULIC STRUCTURES [J].
BAO, YX ;
TUNG, YK ;
HASFURTHER, VR .
WATER RESOURCES RESEARCH, 1987, 23 (11) :2023-2029
[2]  
CHOW VT, 1977, J HYDR ENG DIV-ASCE, V103, P425
[3]  
CORRY ML, 1980, 17 US DEP TRANSP FED
[4]  
JAHANI A, 1986, 1ST P NAT S LARG DAM
[5]  
LEE HL, 1983, WATER RESOUR RES, V19, P1415, DOI 10.1029/WR019i006p01415
[6]  
MAYS LW, 1979, J HYDR ENG DIV-ASCE, V105, P443
[7]   OPTIMAL COST DESIGN OF BRANCHED SEWER SYSTEMS [J].
MAYS, LW ;
YEN, BC .
WATER RESOURCES RESEARCH, 1975, 11 (01) :37-47
[8]  
McCann M. M., 1984, PRELIMINARY SAFETY E, V1
[9]   RISK COSTS FOR NEW DAMS - ECONOMIC-ANALYSIS AND EFFECTS OF MONITORING [J].
PATECORNELL, ME ;
TAGARAS, G .
WATER RESOURCES RESEARCH, 1986, 22 (01) :5-14
[10]   OPTIMIZING SPILLWAY CAPACITY WITH AN ESTIMATED DISTRIBUTION OF FLOODS [J].
RESENDIZCARRILLO, D ;
LAVE, LB .
WATER RESOURCES RESEARCH, 1987, 23 (11) :2043-2049