共 28 条
- [14] Optimization of Starting Conditions of a 500 MW Power Unit with a K-500-240-2 Turbine. Teploenergetika, 1985, (04): : 51 - 55
- [17] LOAD-DEPENDENT FACTOR OF OPERATIONAL COSTS FOR THE PROCESS-CONTROLLING OF AN UNIT COMBINED HEAT AND POWER-STATION BRENNSTOFF-WARME-KRAFT, 1993, 45 (06): : 279 - 283
- [18] WATER-CHEMISTRY CONDITIONS OF THE 1200 MW POWER GENERATING UNIT AT KOSTROMA CENTRAL POWER STATION. Thermal Engineering (English translation of Teploenergetika), 1985, 32 (08): : 459 - 460
- [19] INVESTIGATING THE AERODYNAMICS OF THE FURNACE CHAMBER OF A 500 MW UNIT AT NAZAROVO CENTRAL POWER STATION ON AN ISOTHERMAL MODEL. Thermal Engineering (English translation of Teploenergetika), 1972, 19 (07): : 60 - 63