AN IMPROVED VERSION OF THE PRODUCTION SWITCHING HEURISTIC FOR THE AGGREGATE PRODUCTION PLANNING PROBLEM

被引:7
|
作者
HWANG, H
CHA, CN
机构
[1] Department of Industrial Engineering, Korea Advanced Institute of Science and Technology, Yusong-gu, Taejon, 305-701
[2] Hyundai Electronics Industries Co, Kyongki-do, 467-860, Ichon-kun
关键词
D O I
10.1080/00207549508904832
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The production switching heuristic (PSH) is recognized as an effective solution method for the aggregate production planning problem in industries where production is limited to discrete levels. However, we find that the PSH is not sufficiently responsive to demand fluctuation and tends to make belated decisions. This shortcoming stems mainly from the switching mechanism. This paper proposes an improved version of the PSH. The heuristic uses an improved switching mechanism which can be shown to dominate the PSH. The effectiveness of the proposed heuristic is investigated with several well known problems including the paint factory problem. The results are compared with those of the linear decision rule and the linear programming model as well as the PSH.
引用
收藏
页码:2567 / 2577
页数:11
相关论文
共 50 条
  • [31] AN INTERACTIVE PROCEDURE FOR AGGREGATE PRODUCTION PLANNING
    Nowak, Maciej
    CROATIAN OPERATIONAL RESEARCH REVIEW, 2013, 4 (01) : 247 - 257
  • [32] Aggregate production planning with fuzzy variables
    Wang, R.-C.
    Fang, H.-H.
    International Journal of Industrial Engineering : Theory Applications and Practice, 2001, 8 (01): : 37 - 44
  • [33] Aggregate production planning with fuzzy variables
    Wang, RC
    Fang, HH
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2001, 8 (01): : 37 - 44
  • [34] Aggregate Model for Refinery Production Planning
    Ejikeme-Ugwu, Edith
    Wang, Meihong
    22 EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING, 2012, 30 : 917 - 921
  • [35] Aggregate production planning in a fuzzy environment
    Wang, RC
    Fang, HH
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2000, 7 (01): : 5 - 14
  • [36] An Improved Genetic Algorithm for Production Planning and Scheduling Optimization Problem
    Kunapareddy, Aditya
    Allaka, Gopichand
    INTELLIGENT MANUFACTURING AND ENERGY SUSTAINABILITY, ICIMES 2019, 2020, 169 : 157 - 171
  • [37] A NEW APPROACH TO AGGREGATE PRODUCTION PLANNING
    AKINC, U
    ROODMAN, GM
    IIE TRANSACTIONS, 1986, 18 (01) : 88 - 94
  • [39] The application of fuzzy programming to the aggregate production planning-markdown pricing problem
    zhu, Wenyun
    OPERATIONS RESEARCH AND ITS APPLICATIONS, PROCEEDINGS, 2008, 8 : 457 - 464
  • [40] THE PRODUCTION SWITCHING HEURISTIC UNDER NONSTATIONARY DEMAND
    LAMBRECHT, MR
    LUYTEN, R
    VANDEREECKEN, J
    ENGINEERING COSTS AND PRODUCTION ECONOMICS, 1982, 7 (01): : 55 - 61