共 50 条
[41]
IN-SERVICE INSPECTION OF NUCLEAR POWER-PLANT PRESSURE COMPONENTS
[J].
NUCLEAR SAFETY,
1976, 17 (06)
:733-743
[42]
STRATEGIC RELIABILITY AVAILABILITY MAINTAINABILITY (RAM) IMPROVEMENT PROGRAMS AT A FOSSIL POWER-PLANT
[J].
1989 IIE INTEGRATED SYSTEMS CONFERENCE & SOCIETY FOR INTEGRATED MANUFACTURING CONFERENCE, PROCEEDINGS,
1989,
:346-348
[43]
A NUCLEAR INCIDENT AT A POWER-PLANT IN SOSNOVYY-BOR, RUSSIA
[J].
HEALTH PHYSICS,
1992, 63 (05)
:571-573
[44]
TORNADO-RESISTANT DESIGN OF NUCLEAR POWER-PLANT STRUCTURES
[J].
NUCLEAR SAFETY,
1974, 15 (04)
:432-439
[45]
POWER-PLANT OPERATION TRAINING FOR NUCLEAR ENGINEERING TECHNOLOGY STUDENTS
[J].
TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY,
1972, 15 (02)
:636-+
[46]
ANALYSIS OF SOME ALTERNATIVES OF BICSKE HEAT POWER-PLANT IN COMBINED HEAT AND POWER-GENERATION
[J].
ENERGIA ES ATOMTECHNIKA,
1981, 34 (07)
:317-320
[47]
SOME POSSIBLE WAYS TO IMPROVE NUCLEAR POWER-PLANT INSTRUMENTATION
[J].
NUCLEAR SAFETY,
1981, 22 (06)
:728-737
[48]
US NUCLEAR POWER-PLANT AVAILABILITY AND CAPACITY STATISTICS FOR 1973
[J].
NUCLEAR SAFETY,
1974, 15 (06)
:738-741
[49]
SOME ISSUES IN THE SEISMIC DESIGN OF NUCLEAR POWER-PLANT FACILITIES
[J].
NUCLEAR SAFETY,
1980, 21 (05)
:572-581
[50]
NEUTRONIC INVESTIGATION OF A POWER-PLANT USING PEACEFUL NUCLEAR EXPLOSIVES
[J].
FUSION TECHNOLOGY,
1994, 26 (04)
:1311-1325