A hybrid algorithm to solve the problem of re-entrant manufacturing system scheduling

被引:3
|
作者
Fattahi, Parviz [1 ]
Tavakoli, Neda Beitollahi [2 ]
Jalilvand-Nejad, Amir [1 ]
Jolai, Fariborz [3 ]
机构
[1] Bu Ali Sina Univ, Fac Engn, Dept Ind Engn, Hamadan, Iran
[2] Islam Azad Univ, Hamedan Branch, Dept Engn, Hamadan, Iran
[3] Univ Tehran, Fac Engn, Dept Ind Engn, Tehran, Iran
关键词
Manufacturing system; Cyclic scheduling; Re-entrant manufacturing;
D O I
10.1016/j.cirpj.2011.01.001
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Manufacturing system scheduling is an important field in both of production management and optimization. This system involves many facilities which execute jobs operations. In this paper, the problem of re-entrant manufacturing system scheduling is considered. A scheduling method is elucidated for the re-entrant manufacturing systems, where the process route of a job passes through production facilities one or more times. The maximization of the production rate in order to maximize the output of the system is considered as a main objective of the scheduling problem and the minimization of the work in process is considered as the second objective. Since this problem is well known as NP-Hard class, a bi-objective algorithm which uses the simulated annealing algorithm is developed to solve medium and large size problems. Moreover, a mixed integer linear programming method is presented which can solve the small size problems. The proposed method makes a cyclic schedule, where an adequate number of jobs are treated as a lot and the lot is cyclically released into the system. To evaluate the validity of the proposed algorithm, results are compared with the optimal solution and some presented methods. The computational results validate the efficiency and effectiveness of the proposed algorithm. So, the proposed algorithm can be applied easily in real factory conditions and for the large size problems. So, it should be useful to both practitioners and researchers. (C) 2011 CIRP.
引用
收藏
页码:268 / 278
页数:11
相关论文
共 50 条
  • [1] A hybrid genetic algorithm for the re-entrant flow-shop scheduling problem
    Chen, Jen-Shiang
    Pan, Jason Chao-Hsien
    Lin, Chien-Min
    EXPERT SYSTEMS WITH APPLICATIONS, 2008, 34 (01) : 570 - 577
  • [2] Application of visualized simulation in scheduling re-entrant manufacturing system
    Lu, Wen-Yan
    Dang, Yan-Zhong
    2003, Acta Simulata Systematica Sinica (15):
  • [3] A reinforcement learning approach to re-entrant manufacturing system scheduling
    Liu, CC
    Jin, HY
    Tian, Y
    Yu, HB
    2001 INTERNATIONAL CONFERENCES ON INFO-TECH AND INFO-NET PROCEEDINGS, CONFERENCE A-G: INFO-TECH & INFO-NET: A KEY TO BETTER LIFE, 2001, : C280 - C285
  • [4] Cyclic scheduling for re-entrant manufacturing systems
    Yura, K
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1999, 60-1 : 523 - 528
  • [5] Research on Re-entrant System Scheduling Problem Based on Petri Net and Ant Colony Algorithm
    Zhang Mei
    You Jia
    Hu Yueming
    2014 33RD CHINESE CONTROL CONFERENCE (CCC), 2014, : 7561 - 7566
  • [6] A memetic algorithm for energy-efficient distributed re-entrant hybrid flow shop scheduling problem
    Geng, Kaifeng
    Ye, Chunming
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2021, 41 (02) : 3951 - 3971
  • [7] A re-entrant hybrid flow shop scheduling problem with machine eligibility constraints
    Zhang, Xiang Yi
    Chen, Lu
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2018, 56 (16) : 5293 - 5305
  • [8] Re-entrant Production Scheduling Problem Under Uncertainty Based On QPSO Algorithm
    Pan, Fengshan
    Ye, Chunming
    Zhou, Jihua
    MECHANICAL, MATERIALS AND MANUFACTURING ENGINEERING, PTS 1-3, 2011, 66-68 : 1061 - 1066
  • [9] A memetic algorithm for the re-entrant permutation flowshop scheduling problem to minimize the makespan
    Xu, Jianyou
    Yin, Yunqiang
    Cheng, T. C. E.
    Wu, Chin-Chia
    Gu, Shusheng
    APPLIED SOFT COMPUTING, 2014, 24 : 277 - 283
  • [10] A review of the research methodology for the re-entrant scheduling problem
    Lin Danping
    Lee, Carman K. M.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2011, 49 (08) : 2221 - 2242