CRITICAL UNCERTAINTY FACTORS FOR EFFICIENT RISK ALLOCATION IN PRIVATELY FINANCED PUBLIC INFRASTRUCTURE PROJECTS IN AUSTRALIA

被引:12
作者
Jin, Xiao-Hua [1 ]
Zuo, Jian [2 ]
机构
[1] Deakin Univ, Fac Sci & Technol, Sch Architecture & Bldg, Geelong, Vic 3217, Australia
[2] Univ South Australia, Sch Nat & Built Environm, Div Informat Technol Engn & Environm, Adelaide, SA 5000, Australia
关键词
Uncertainty; Risk allocation; Public-private partnership; Australia;
D O I
10.1080/15623599.2011.10773170
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Risk allocation in privately financed public infrastructure projects, commonly referred to as public-private partnership (PPP) projects, is a challenging job due to the nature of incomplete contracting. Choosing a risk allocation strategy could be viewed as the process of deciding the proportion of risk management attributable to the public and private partners based on a series of characteristics of the risk management service transaction in question. These characteristics can be related to the various uncertainty factors. In this study, uncertainty factors have been grouped into Institutional, Social and industrial, Economic, and Project-specific categories and examined in order to achieve efficient risk allocation and minimize risk management-related costs in a long-term view. Critical uncertainty factors for the allocation of three major risks have been identified through an industry-wide survey in Australia. These identified critical uncertainty factors are expected to help decision-makers from both public and private sectors choose efficient allocation strategies for major risks. Future research directions are also set out.
引用
收藏
页码:19 / 34
页数:16
相关论文
共 78 条
  • [1] Abednego M. P., 2006, International Journal of Project Management, V24, P622, DOI 10.1016/j.ijproman.2006.07.010
  • [2] The importance and allocation of risks in Indonesian construction projects
    Andi
    [J]. CONSTRUCTION MANAGEMENT AND ECONOMICS, 2006, 24 (01) : 69 - 80
  • [3] [Anonymous], 1985, SUMMA SUMMARUM MANAG
  • [4] [Anonymous], 1961, ADM BEHAV
  • [5] Designing and renegotiating strategic alliance contracts
    Ariño, A
    Reuer, JJ
    [J]. ACADEMY OF MANAGEMENT EXECUTIVE, 2004, 18 (03): : 37 - 48
  • [6] Arndt R., 1999, T MULTIDISCIPLINARY, V22, P1
  • [7] Bourgeois L.J., 1980, ACAD MANAGE REV, V5, P25, DOI DOI 10.2307/257802
  • [8] Managing marketing channel opportunism: The efficacy of alternative governance mechanisms
    Brown, JR
    Dev, CS
    Lee, DJ
    [J]. JOURNAL OF MARKETING, 2000, 64 (02) : 51 - 65
  • [9] Buckley PJ, 1988, COOPERATIVE STRATEGI, P31
  • [10] BUSCH LA, 1992, ENDOGENOUS INCOMPLET