COST-EFFECTIVE FORECASTING - LESSONS MY COMPUTER-PROGRAMS NEVER TAUGHT ME

被引:2
作者
PERRY, C
EULER, T
机构
来源
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE | 1990年 / 18卷 / 03期
关键词
combining forecasts; cost effectiveness;
D O I
10.1016/0305-0483(90)90038-B
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper derives lessons about the processes of forecasting in consulting situations where time is a scarce resource. These lessons about cost-effective forecasting are illustrated in a disguised composite consulting project which takes far longer than originally forecast. The lessons cover aspects of forecasting such as the political implications of forecasts, why several different types of forecasts should be combined into a final forecast, and why the Delphi technique is not a cost-effective way of making judgmental forecasts. © 1990.
引用
收藏
页码:241 / 246
页数:6
相关论文
共 6 条
[1]  
Armstrong J. S., 1978, LONG RANGE FORECASTI
[2]  
ARMSTRONG JS, 1986, INTERFACES, V16, P89, DOI 10.1287/inte.16.1.89
[3]  
Georgeoff D. M., 1986, HARVARD BUSINESS JAN, P110
[4]   THE ACCURACY OF COMBINING JUDGMENTAL AND STATISTICAL FORECASTS [J].
LAWRENCE, MJ ;
EDMUNDSON, RH ;
OCONNOR, MJ .
MANAGEMENT SCIENCE, 1986, 32 (12) :1521-1532
[5]   AVERAGES OF FORECASTS - SOME EMPIRICAL RESULTS [J].
MAKRIDAKIS, S ;
WINKLER, RL .
MANAGEMENT SCIENCE, 1983, 29 (09) :987-996
[6]  
Sackman H, 1975, DELPHI CRITIQUE EXPE