THREE-MACHINE FLOWSHOP SCHEDULING PROBLEM TO MINIMIZE MAKESPAN WITH BOUNDED SETUP AND PROCESSING TIMES

被引:6
作者
Allahverdi, Ali [1 ]
机构
[1] Kuwait Univ, Coll Engn & Petr, Dept Ind & Management Syst Engn, POB 5969, Safat, Kuwait
关键词
Scheduling; flowshop; makespan; dominance relations; bounded processing and setup times;
D O I
10.1080/10170660809509072
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The problem of scheduling n jobs on a three-machine flowshop is addressed where setup times are considered as separate from processing times and sequence-independent. The objective is to minimize makespan. Both setup and processing times are unknown variables before the actual occurrence of these times. However, a lower bound and an upper bound are given (known) for each setup and processing time. For this problem, there may not exist a unique schedule that remains optimal for all possible realizations of setup and processing times. Hence, it is desirable to obtain a set of dominating set of schedules (which dominate all other schedules) if possible. The objective is to reduce the size of dominating set. One way of reducing the size of dominating set is to come up with dominance relations. In this paper, global and local dominance relations are developed for the problem. Moreover, the use of developed dominance relations to reduce the size of the set is illustrated by an example and computational analysis is conducted on randomly generated problems.
引用
收藏
页码:52 / 61
页数:10
相关论文
共 50 条
[31]   Bounded dynamic programming approach to minimize makespan in the blocking flowshop prob- lem with sequence dependent setup times [J].
Gonsalves de Souza, Edson Antonio ;
Naganoa, Marcelo Seido ;
Miyataa, Hugo Hissashi ;
de Abreu, Levi Ribeiro .
JOURNAL OF PROJECT MANAGEMENT, 2022, :99-118
[32]   Single machine scheduling with controllable processing times and an unavailability period to minimize the makespan [J].
Shabtay, Dvir ;
Zofi, Moshe .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2018, 198 :191-200
[33]   A NO-WAIT FLOWSHOP SCHEDULING HEURISTIC TO MINIMIZE MAKESPAN [J].
RAJENDRAN, C .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1994, 45 (04) :472-478
[34]   A new heuristic for the flowshop scheduling problem to minimize makespan and maximum tardiness [J].
Braglia, Marcello ;
Grassi, Andrea .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2009, 47 (01) :273-288
[35]   A Hybrid Local Search Algorithm for the Sequence Dependent Setup Times Flowshop Scheduling Problem with Makespan Criterion [J].
Wang, Yunhe ;
Li, Xiangtao ;
Ma, Zhiqiang .
SUSTAINABILITY, 2017, 9 (12)
[36]   Scheduling Piecewise Linear Deteriorating Jobs to Minimize Makespan in a Two-Machine Flowshop [J].
Jafari-Nodoushan A. ;
Zare H.K. ;
Lotfi M.M. ;
Tavakkoli-Moghaddam R. .
Operations Research Forum, 2 (4)
[37]   Two-machine flowshop scheduling with processing times depending on waiting times [J].
Wang, Qiuhuan ;
Xing, Wenxun .
Proceedings of the Fifth International Conference on Information and Management Sciences, 2006, 5 :449-453
[38]   A two-machine flowshop makespan scheduling problem with deteriorating jobs [J].
Lee, Wen-Chiung ;
Wu, Chin-Chia ;
Wen, Chien-Chih ;
Chung, Yu-Hsiang .
COMPUTERS & INDUSTRIAL ENGINEERING, 2008, 54 (04) :737-749
[39]   Three-machine flowshop scheduling with outsourcing lead-time [J].
Kim, Eun-Seok ;
Lee, Kangbae ;
Lee, Ik Sun .
COMPUTERS & OPERATIONS RESEARCH, 2025, 183
[40]   Makespan minimization for m-machine permutation flowshop scheduling problem with learning considerations [J].
Yu-Hsiang Chung ;
Lee-Ing Tong .
The International Journal of Advanced Manufacturing Technology, 2011, 56 :355-367