THREE-MACHINE FLOWSHOP SCHEDULING PROBLEM TO MINIMIZE MAKESPAN WITH BOUNDED SETUP AND PROCESSING TIMES

被引:6
作者
Allahverdi, Ali [1 ]
机构
[1] Kuwait Univ, Coll Engn & Petr, Dept Ind & Management Syst Engn, POB 5969, Safat, Kuwait
关键词
Scheduling; flowshop; makespan; dominance relations; bounded processing and setup times;
D O I
10.1080/10170660809509072
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The problem of scheduling n jobs on a three-machine flowshop is addressed where setup times are considered as separate from processing times and sequence-independent. The objective is to minimize makespan. Both setup and processing times are unknown variables before the actual occurrence of these times. However, a lower bound and an upper bound are given (known) for each setup and processing time. For this problem, there may not exist a unique schedule that remains optimal for all possible realizations of setup and processing times. Hence, it is desirable to obtain a set of dominating set of schedules (which dominate all other schedules) if possible. The objective is to reduce the size of dominating set. One way of reducing the size of dominating set is to come up with dominance relations. In this paper, global and local dominance relations are developed for the problem. Moreover, the use of developed dominance relations to reduce the size of the set is illustrated by an example and computational analysis is conducted on randomly generated problems.
引用
收藏
页码:52 / 61
页数:10
相关论文
共 50 条
[21]   Parallel machine scheduling problem to minimize the makespan with resource dependent processing times [J].
Li, Kai ;
Shi, Ye ;
Yang, Shan-lin ;
Cheng, Ba-yi .
APPLIED SOFT COMPUTING, 2011, 11 (08) :5551-5557
[22]   Two-machine no-wait flowshop scheduling problem with uncertain setup times to minimize maximum lateness [J].
Ali Allahverdi ;
Muberra Allahverdi .
Computational and Applied Mathematics, 2018, 37 :6774-6794
[23]   Parallel-machine scheduling to minimize makespan with fuzzy processing times and learning effects [J].
Yeh, Wei-Chang ;
Lai, Peng-Jen ;
Lee, Wen-Chiung ;
Chuang, Mei-Chi .
INFORMATION SCIENCES, 2014, 269 :142-158
[24]   Minimising Makespan and total tardiness for the flowshop group scheduling problem with sequence dependent setup times [J].
He, Xuan ;
Pan, Quan-Ke ;
Gao, Liang ;
Neufeld, Janis S. ;
Gupta, Jatinder N. D. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2025, 324 (02) :436-453
[25]   A multicriteria flowshop scheduling problem with setup times [J].
Eren, Tamer .
JOURNAL OF MATERIALS PROCESSING TECHNOLOGY, 2007, 186 (1-3) :60-65
[26]   Scheduling the distributed assembly flowshop problem to minimize the makespan [J].
Ochi, Hanadi ;
Driss, Olfa Belkahla .
CENTERIS2019--INTERNATIONAL CONFERENCE ON ENTERPRISE INFORMATION SYSTEMS/PROJMAN2019--INTERNATIONAL CONFERENCE ON PROJECT MANAGEMENT/HCIST2019--INTERNATIONAL CONFERENCE ON HEALTH AND SOCIAL CARE INFORMATION SYSTEMS AND TECHNOLOGIES, 2019, 164 :471-477
[27]   Minimizing makespan for no-wait flowshop scheduling problems with setup times [J].
Ying, Kuo-Ching ;
Lin, Shih-Wei .
COMPUTERS & INDUSTRIAL ENGINEERING, 2018, 121 :73-81
[28]   Scheduling with discretely compressible processing times to minimize makespan [J].
Zhang, Shu-Xia ;
Cao, Zhi-Gang ;
Zhang, Yu-Zhong .
OPERATIONS RESEARCH AND ITS APPLICATIONS, 2006, 6 :258-+
[29]   An efficient heuristic for a two-stage assembly scheduling problem with batch setup times to minimize makespan [J].
Liao, Ching-Jong ;
Lee, Cheng-Hsiung ;
Lee, Hong-Chieh .
COMPUTERS & INDUSTRIAL ENGINEERING, 2015, 88 :317-325
[30]   Evolutionary heuristics and an algorithm for the two-stage assembly scheduling problem to minimize makespan with setup times [J].
Allahverdi, Ali ;
Al-Anzi, Fawaz S. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2006, 44 (22) :4713-4735