共 50 条
[41]
Design and development of vibration test system for power transformer on-load tap changer
[J].
Yi Qi Yi Biao Xue Bao/Chinese Journal of Scientific Instrument,
2013, 34 (05)
:987-993
[42]
FIRE-SIDE CORROSION IN POWER-STATION BOILERS.
[J].
Combustion New York, N.Y.,
1980, 52 (06)
:17-25
[44]
Power Transformer On-Load Capacity-Regulating Control and Optimization Based on Load Forecasting and Hesitant Fuzzy Control
[J].
SYMMETRY-BASEL,
2024, 16 (06)
[45]
Analysis of a power topology for a quasi-resonant fast on-load tap changing regulator
[J].
2002 IEEE INTERNATIONAL SYMPOSIUM ON CIRCUITS AND SYSTEMS, VOL V, PROCEEDINGS,
2002,
:837-840
[47]
Design of an Adaptive On-load De-icing Scheme for Overhead Power Transmission Line
[J].
2009 IEEE POWER & ENERGY SOCIETY GENERAL MEETING, VOLS 1-8,
2009,
:1444-1448
[48]
Effect of Rooftop-PV on Power Transformer Insulation and On-Load Tap Changer Operation
[J].
2015 IEEE PES ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC),
2015,
[49]
Managing Cascade Transformers Equipped with On-Load Tap Changers in Bidirectional Power Flow Environment
[J].
2015 IEEE EINDHOVEN POWERTECH,
2015,
[50]
Hardware Circuit Design of On-load Voltage Regulation Switch based on High Power IGBT
[J].
2017 IEEE 2ND ADVANCED INFORMATION TECHNOLOGY, ELECTRONIC AND AUTOMATION CONTROL CONFERENCE (IAEAC),
2017,
:22-25