共 50 条
- [21] NUCLEAR STEAM-GENERATORS AND WASTE HEAT BOILERS TWO-PHASE FLOW HEAT EXCHANGES: THERMAL-HYDRAULIC FUNDAMENTALS AND DESIGN, 1988, 143 : 659 - 682
- [25] LINEARIZED TRANSIENT ANALYSIS OF NUCLEAR STEAM-GENERATORS TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1979, 32 (JUN): : 287 - 290
- [26] PLANS FOR REPLACEMENT OF THE PALISADES PLANT STEAM-GENERATORS TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1983, 44 : 493 - 494
- [27] STEAM-GENERATORS IN NUCLEAR-POWER PLANTS WITH PRESSURIZED WATER-REACTORS KERNENERGIE, 1979, 22 (01): : 1 - 4
- [28] CALCULATION OF THE NUCLEAR-POWER PLANT V-1 STEAM-GENERATORS OPERATIONAL CHARACTERISTICS IN THE STATIONARY REGIMENS JADERNA ENERGIE, 1979, 25 (01): : 2 - 7
- [29] PERIODICAL CHEMICAL CLEANING OF THE STEAM-GENERATORS SECONDARY SIDE AT THE GREIFSWALD NUCLEAR-POWER-PLANT LEUSCHNER,BRUNO KERNENERGIE, 1990, 33 (09): : 356 - 359