共 37 条
[11]
Dlakwa M., 1990, INT J PROJ MANAG, V8, P237, DOI 10.1016/0263-7863(90)90032-7
[12]
Egan J., 1998, RETHINKING CONSTRUCT
[13]
CONSTRUCTION COST FACTORS IN NIGERIA
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
1993, 119 (04)
:698-713
[14]
Everett A., 1994, MITCHELLS BUILDING S
[15]
Fagbenle OI, 2004, CONSTR MANAG EC, V22, P899
[16]
Farooqui R. U., 2008, 1 INT C CONSTR DEV C, P499, DOI DOI 10.1080/01446190601114134
[17]
Hong Xiao, 2003, Engineering Construction and Architectural Management, V10, P322, DOI 10.1108/09699980310502937
[18]
Ibn-Homaid NT., 2002, INT J PROJ MANAGE, V20, P263, DOI DOI 10.1016/S0263-7863(01)00013-8
[19]
Idoro GI., 2010, P CIB INT C BUILD ED, P103
[20]
Jagboro GO., 2004, MALAYSIAN SURVEYOR, V5, P9